SE KCC PIPRI
Office of SE KCC Pipri
Construction of Barrel Syphon At km. 14.950 of Right Kanhar Canal
2025_UPIDC_1103098_3
05/SE/2025-26
Open Tender
Civil Works
Item Rate
180 days
Village- Jampani, Tahsil-Duddhi, Distt- Sonbhadra
please refer for tender document
2 documents required · 2 mandatory
₹2,360
₹4.3 L
27 Jan 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work as per direction of Engineer-in Charge.
M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, with mechanical mixing and placing of concrete , royalty and all taxes etc. for proper completion of work.
Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift with mechanical mixing and placing of concrete, royalty and all taxes etc. but excluding cost of steel reinforcement for proper completion of work
Centering and shuttering for RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work..
Centering and shuttering for CC work including cost of labour, material, T&P, staging etc. required for proper completion of work.
Cutting, bending, placing and binding of steel reinforcement including cost of all material, labour, T&P, M.S. binding wire and all taxes etc for proper completion of work.
Providing and fixing of G.P. Sheet seal of 20 SWG 300 mm. wide including cost of all materials, labour, T&P, cutting, bending, brazing, crimping etc required for proper completion of work.
Providing and fixing of U type make from 22SWG 470mm. Wide copper seal including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
Providing and fixing of diamond seal with 2No ISA size 75x75x10 iron flat 150x25x6@200mm. c/c for fixing M.S. sheet of 16 SWG 510mm, 1.63 mm wide 40-80 grade sealing compound including cost of cutting, bending, brazing, crimping etc. required for proper completion of work.
Providing and fixing of PVC water stop seal 225 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
Providing and fixing joint filler board 18mm thick in expansion joint including cost of all labour, material, T&P, required cutting, brazing and placing etc. for proper completion of work.
Laying corse sand in filter including cost of all materials, labours, T&P etc. required of all proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying hard stone dalla grit 4.75 mm to 10 mm size in filters and in gaps of C.C. block including cost of all material, labour , T&P lead etc. required for proper completion of work.
Supplying and laying hard stone dalla grit 10 mm to 20 mm size in filters and in gaps of C.C. block including cost of all material, labour , T&P lead etc required for proper completion of work.
Providing and fixing Tarfelt in expansion joint including cost of all labour materials and T&P etc. required for proper completion of work.
Proviniding and fixing 100mm dia PVC pipe including cost of all material, labours, T&P, etc. required for proper completion of the work.
Earth work in back filling in back of Abutment and wing wall including all lead, lift labours, T&P, royalty and all taxes etc. for proper completion of the work.
Earth work In making drain diversion work to facilitate proposed work on site properly with manual compaction including cost of all lead, lift, labour, T&P, taxes etc. for proper completion of the work.
Laying of Stone boulder for pitching in launching apron side pitching beyond L.A. bed and pitching at side slope of earth filling over box culvert including cost of all materials labours T&P , royalty and all taxes etc required for proper completion of the work.(weight not less than 40 kg)
Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
TenderDocument05SE2025.pdf
Tender Documents • 3.88 MB
BOQ_2049545.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .