Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹25.6 L+₹71,612 (2.87%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹26.4 L+₹1.4 L (5.79%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HI-TECH ENGINEERING WORKS L1 | MEDITEK L2 | MEDISHINE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repairing servicing and re-installation of Air compressor. | 3 | NOS | 4,21,000 ₹12,63,000 Lowest | 4,30,000 ₹12,90,000 | 4,42,690 ₹13,28,070 |
| 2.00 | Repairing servicing and re-installation of Air dryer. | 2 | NOS | 2,11,000 ₹4,22,000 Lowest | 2,16,100 ₹4,32,200 | 2,22,400 ₹4,44,800 |
| 3.00 | SITC of 28mm Single Port Ball Valve with Pipe line assembly (pre piped): Pre Piped Degreased Ball Valve with pipe extension. It should be full-port design. It should be blow-out proof stem. It should be lockable valve. | 6 | NOS | 16,653 ₹99,918 Lowest | 16,980 ₹1,01,880 | 17,400 ₹1,04,400 |
| 4.00 | SITC of copper pipe 28MM X 0.9MM thick | 60 | MTRS | 1,944 ₹1,16,640 Lowest | 2,040 ₹1,22,400 | 2,060 ₹1,23,600 |
| 5.00 | Supply and Installation of humidity and temperature control system (1.5 Ton Split AC) | 2 | Nos | 61,700 ₹1,23,400 Lowest | 63,000 ₹1,26,000 | 64,880 ₹1,29,760 |
| 6.00 | Construction of 9" brick wall along with plaster and Door with painting of the room | 1 | job | 59,000 ₹59,000 Lowest | 61,200 ₹61,200 | 63,000 ₹63,000 |
| 7.00 | Dismantling the existing tank -1no, compressor-3nos, Control panel -1no, after cooler -3nos and dryer -2nos | 1 | JOB | 45,000 ₹45,000 Lowest | 51,000 ₹51,000 | 52,500 ₹52,500 |
| 8.00 | Reinstallation of air receiver tank along with foundation and painting | 1 | JOB | 54,000 ₹54,000 Lowest | 55,700 ₹55,700 | 57,390 ₹57,390 |
| 9.00 | Shifting of compressor -3nos, Dryer-2nos and transportation of material from seven Hills hospital to Nair Hospital Dental college | 1 | JOB | 2,20,000 ₹2,20,000 Lowest | 2,31,590 ₹2,31,590 | 2,38,400 ₹2,38,400 |
| 10.00 | SITC of Internal Electrical Work, Fan, Tube light Etc and main cable from panel required for compressor | 1 | Job | 90,000 ₹90,000 Lowest | 92,600 ₹92,600 | 95,360 ₹95,360 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
27 Oct 2025, 4:00 pmClosed
M.H.Wankhede
EEMechEIConst
The work of up gradation of medical gas system Compressor system by Servicing reinstalling equipment collected from Seven Hills hospital and installing it at Nair Hospital Dental College
2025_MCGM_1227737_1
ChE/ME/ 3997 Dt.26.09.2025
Open Tender
Electrical Works
Item Rate
180 days
Nair Dental Hospital
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,567
₹30,000
18 Nov 2025
11 Oct 2025
28 Oct 2025
11 Oct 2025
27 Oct 2025
11 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
DT.pdf
Tender Documents • 6.82 MB
BOQ_2119434.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .