| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L Quoted ₹7.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.1 LRejected-AOC | ₹8.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R THAVAMANI | MANSOOR |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and lifit of 2m including cost of all materials, labours, lead, lift, etc. complete | 0.9 | M3 | 81.75 ₹96.47 | 87.3 ₹103.01 |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 0.9 | M3 | 4,328.29 ₹5,107.38 | 4,540.5 ₹5,357.79 |
| 3.00 | Removing the spalled/distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface thoroughly with reebaklens fosroc acid/equivelent with all lead, lift, labour, etc., complete. | 47.8 | M2 | 25,280.94 ₹29,831.51 | 26,481.2 ₹31,247.82 |
| 4.00 | Chipping the existing concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 60 | M2 | 2,671.2 ₹3,152.02 | 2,880 ₹3,398.40 |
| 5.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 24.3 | M2 | 227.21 ₹268.11 | 267.3 ₹315.41 |
| 6.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer in charge including cost of labour, Lead, lift, T&P etc., complete. | 60 | M2 | 3,043.2 ₹3,590.98 | 3,300 ₹3,894 |
| 7.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete | 14.7 | M2 | 15,847.19 ₹18,699.68 | 16,684.5 ₹19,687.71 |
| 8.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 4.5 | M3 | 44,697.11 ₹52,742.59 | 46,867.5 ₹55,303.65 |
| 9.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 270 | Kg | 25,968.6 ₹30,642.95 | 27,540 ₹32,497.20 |
| 10.00 | Brick work in CM 1:5 using fly ash bricks including cost of all materials, Labours, lead, curing, etc. complete | 1 | M3 | 6,790.56 ₹8,012.86 | 7,115 ₹8,395.70 |
Tender Value
Refer Docs
EMD Value
₹8,100
Closing Date
21 Oct 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair works to the 2G Quarters Block No. 1 and 2 at Inspection Bungalow TTPS
2025_EB_611239_1
CE SE C TTPS 260 2025 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,100
Yes
26 Feb 2026
3 Oct 2025
22 Oct 2025
3 Oct 2025
21 Oct 2025
3 Oct 2025
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and lifit of 2m including cost of all materials, labours, lead, lift, etc. complete
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Removing the spalled/distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface thoroughly with reebaklens fosroc acid/equivelent with all lead, lift, labour, etc., complete.
Chipping the existing concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer in charge including cost of labour, Lead, lift, T&P etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete
Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete.
Brick work in CM 1:5 using fly ash bricks including cost of all materials, Labours, lead, curing, etc. complete
Providing PCC 1:4:8 using OP/PP cement with 12 to 20 mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Plastering with CM 1:5, 20mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete.
Providing Terrace tiles of single 200 x 200 x 20mm tiles using CM 1:3, mixed with crude oil 1% by weight of cement and pointing with same oiled mortar etc, including cost of all materials, lead, labours, lift curing etc., complete - for 10 Sqm.
Supplying and fixing in position of PVC door of approved quality and colour with 25mm thick PVC shutter including cost of all specials, materials, labour, lead, lift etc., complete.
Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc., complete.
Providing and fixing steel door of required size with single leaf, frame using 30 x 30 x 5mm M.S.angle shutters with 30 x 20 x 3mm M.S.angle and flat 4 x 5mm for door stiffner center porotion 20 x 5mm for shutter stiffner horizontal and 16 x 5mm for door stiffner outer vertical and horizontal with 2mm thick M.S.Sheet both sides made with 2 no. tower bolt, 1 no. aldrop, 2 no handles, 3 nos. hinges with cost of all materials labour, lead, lift etc., complete including two coats of approved quality enamel paint over the one coat of red oxide primer.
Painting old wall surface with two coat of ready mixed plastic emulsion (interior walls) of first class quality paint and approved colour without priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Painting old wall surface with two coat of Asian make ACE exterior paint (or) equivalent over the existing wall surface without priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Painting two coats with ready mixed enamel paint for the old wooden doors, windows including cost of all materials, through cleaning of surface, labours, lead, lift curing, etc. complete.
Replacing the Indian water closet of size 580 x 440mm white glazed earthware with 'P' trap with sand cushion and forming flooring alround the water closet using 20mm brick jelly in lime concrete and plastering with CM 1:3, 20mm thick including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing 6Kg/cm2 PVC pipe for sanitary arrangements of approved quality size of 110mm dia and 75mm dia including cost of specials, all other materials required labour, lead, lift, etc., complete. a) 110mm dia pipe
b) 75mm dia pipe
Supplying and providing GI pipe of various size in water tanks as delivery/drain pipes including dismantling brick work, fixing the GI pipe inclusive of cutting and threading and finishing the hole with PCC 1:1.5:3 concrete wherever necessary including cost of all materials, labour, lead, lift etc, complete. a) 15mm dia GI Pipe
20mm dia GI Pipe
25mm dia GI Pipe
32mm dia GI Pipe
Supplying and fixing in position of various size in GM Gate valve / Wheel valve of heavy duty by replace the existing damaged wheel valve including cost of valve, labour, Lead, lift, etc, complete a) 20mm dia wheel Valve
25mm dia wheel Valve
32mm dia wheel Valve
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_730372.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid