Loading…
Loading…
Tender Value
₹29.5 L
EMD Value
₹59,000
Closing Date
17 Jul 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Inspection, Servicing and reconditioning of Transformer of Electric Arc Furnace A.
RWF-EL-OT-WSC-2026-27-32
RWF-EL-OT-WSC-2026-27-32
Open
Works - General
12 Months
Bengaluru Urban, Karnataka
₹0
₹59,000
17 Jul 2026
16 Jun 2026
24 Jun 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 29,50,000 | ||
| — | 1.00 | — | — | ||
| 1. Disconnection of LT Bus tubes. 2. Disconnection of HT cables. 3. Draining out oil 4. Disconnecting of conservator 5. Shifting the roof slabs and if required removal of transformer bus tube from wall 6. Disconnection of tap changer connection 7. Removing of diverter switch 8. Removing of top cover of transformer 9. Inspection, Cleaning and required attention of winding and magnetic core 10. Checking and attention for any loose connections and fasteners(including replacement if required) 11. Checking and attention to the condition of insulation(including replacement if required) 12. Cleaning and attention of Transformer tank 13. Replacement of all the gaskets and transformer riser insulation sheets 14. Restoration of Top Cover of Transformer 15. Restoration of diverter switch and synchronization of diverter switches 16. Restoration of tap changer connection 17. Restoration of the roof slabs& transformer bus tube 18. Restoration of conservator 19. Filling of Oil and filtration 20. Vacuuming the transformer winding in the tank for removal of moisture and improving the insulation resistance 21. Restoration of HT cables 22. Restoration of LT Bus tubes 23. Idle charging 24. Trial arcing 25. Arresting of Oil/Water Leakage, if any 26. Carrying of tests below after restoration of works mentioned a. Oil leakage testing. b. Oil sample testing for DGA and Furan from NABL accredited lab or CPRI. c. Winding Resistance d. Voltage Ratio / Turns Ratio Test e. Magnetic Balance Test f. Magnetizing Current g. Insulation Resistance and Oil BDV Test. 27. Any other contingency works connected with the above 28(A). The Contractor shall arrange all consumables and minor materials required for servicing of the Arc Furnace Transformer, including but not limited to gaskets, O-rings, sealing kits, silica gel, insulating tapes, cleaning solvents, cotton waste, grease, anti-rust compounds, nuts, bolts, washers, cable lugs, ferrules, heat-shrink sleeves, touch-up paint, and other miscellaneous consumables. 28(B). Any defective items/components noticed during servicing, such as gaskets, seals, breather parts, valve glands, pressure gauge accessories, terminal hardware, Epoxy Plates for Risers, marshalling box accessories, cooling system fittings, OLTC contact consumables (where applicable), and other minor replaceable materials required to complete the work satisfactorily, excluding Transformer Oil, shall be supplied and replaced by the Contractor at no additional cost to the Purchaser. 29. All the necessary test certificate and transformer fitness certificate to be provided 30. Firm must give warranty for at least 12 months after successfully reconditioning of transformer and starting of furnace. | — | — | — | 29,50,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstotenderer.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVScheduleofwork.pdf
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC
ATTACHMENT
GCC_April-2022_merged_compressed_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .