Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-Finance | L1 | Accepted-Finance L1 BIDDER | |
| 2 | L2₹11.9 L+₹14,807.23 (1.26%)Accepted-Finance | L2 | Accepted-Finance L2 BIDDER |
| Sl No | Description | Qty | Unit | GV ELLAIYAN CONTRACTORS L2 | KARTHIK ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Erection Portion: | |||||
| 1.01 | Charges for Erection of necessary scaffolding arrangements in SWRO agitator and its dozing area including T & P's and consumables etc., and dismantling the scaffolding arrangement after completing the work. | 120 | SQ.MTR | 300 ₹36,000 | 250 ₹30,000 Lowest |
| 1.02 | Charges for removal of Agitator in SWRO chemical dosing tank Agitator by Decoupling the motor and gearbox, gearbox shaft coupling and removal from tank, after completion of structure work re fixing gearbox with shaft coupling and coupling the motor and gearbox including consumables and hire charges for T&P,s. | 6 | NOS | 4,500 ₹27,000 | 4,400 ₹26,400 Lowest |
| 1.03 | Charges for fabrication and erection of MSRL supporting structure in SWRO agitator and its dozing area, including transportation, hire charges for T&P and cost of consumables. | 3.45 | MT | 77,350 ₹2,66,857.5 | 77,280 ₹2,66,616 Lowest |
| 1.04 | Charges for providing and placing RCC 1:1 1/2:3 using 20 MM HBG metal including cost of all materials, lead, lift labour, LWF, vibrating charges and mixing charges excluding the cost or reinforcement etc., complete, including consumable and T&P’s. | 0.45 | CU.MTR | 9,300 ₹4,185 | 9,200 ₹4,140 Lowest |
| 1.05 | Charges for rubber lining, Sand blasting, Coating of adhesive compound providing 8 hours gap between each coating before patching of natural rubber, rubber lining (Vulcanizing) by hot banding process of the acid line, ejector pipe and lye line pipe inclusive of T & Ps and consumables. | 87.92 | SQ.MTR | 4,750 ₹4,17,620 | 4,700 ₹4,13,224 Lowest |
| 1.06 | Paving the floor with acid alkali resistance tiles/bricks with standard specification and using acid alkali resistance tiles/bricks | 5.76 | SQ.MTR | 2,100 ₹12,096 | 2,000 ₹11,520 Lowest |
| 2.00Material Supply Portion: | |||||
| 2.01 | Supply of 16 mm plate | 0.52 | MT | 86,300 ₹44,703.4 | 86,100 ₹44,599.8 Lowest |
| 2.02 | Supply of ISMC 125 | 2.93 | MT | 68,200 ₹1,99,962.4 | 68,000 ₹1,99,376 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
26 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER/NCTPP III
NCTPP-III,CHENNAI 600120
NCTPP III Mechanical I Circle Common Auxiliaries Division RODM Plant Dismantling Fabrication Rubber lining and Erection of MSRL Supports including cost of material in the SWRO dosing tank agitator area and acid tank area
2026_EB_655771_1
CE/ NCTPP III/SE/M-I/OT-12/2025-26
Open Tender
Maintenance Works
Item Rate
60 days
NCTPP III CHENNAI
REFER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹7,800
Yes
9 Jun 2026
12 Feb 2026
27 Feb 2026
12 Feb 2026
26 Feb 2026
12 Feb 2026
Erection Portion:
Charges for Erection of necessary scaffolding arrangements in SWRO agitator and its dozing area including T & P's and consumables etc., and dismantling the scaffolding arrangement after completing the work.
Charges for removal of Agitator in SWRO chemical dosing tank Agitator by Decoupling the motor and gearbox, gearbox shaft coupling and removal from tank, after completion of structure work re fixing gearbox with shaft coupling and coupling the motor and gearbox including consumables and hire charges for T&P,s.
Charges for fabrication and erection of MSRL supporting structure in SWRO agitator and its dozing area, including transportation, hire charges for T&P and cost of consumables.
Charges for providing and placing RCC 1:1 1/2:3 using 20 MM HBG metal including cost of all materials, lead, lift labour, LWF, vibrating charges and mixing charges excluding the cost or reinforcement etc., complete, including consumable and T&P’s.
Charges for rubber lining, Sand blasting, Coating of adhesive compound providing 8 hours gap between each coating before patching of natural rubber, rubber lining (Vulcanizing) by hot banding process of the acid line, ejector pipe and lye line pipe inclusive of T & Ps and consumables.
Paving the floor with acid alkali resistance tiles/bricks with standard specification and using acid alkali resistance tiles/bricks
Material Supply Portion:
Supply of 16 mm plate
Supply of ISMC 125
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_786361.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .