Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 CrQualified PLOT NO 132 133 PHASE V IDA JEEDIMETLA HYDERABAD RANGAREDDY TELANGANA 500055 | MEDCHAL MALKAJGIRI | TELANGANA | 500055 | ₹13.4 Cr | L1 | Qualified MII |
| 2 | Disqualified | - | - | Disqualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
12 Sept 2022, 1:00 pmClosed
Isolator Package IS01 for bulk procurement
3703365
GEM/2022/B/2457201
420KV, 3150A, 63KA 3PH DB ISOLATOR WITH 1ES,245KV, 1600A, 50KA, 3PH DB ISOLATOR WITH 1ES,245KV, 160
Unknown (Unspecified Location)
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
Exempted
19 Sept 2022
22 Aug 2022
12 Sept 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | 420KV, 3150A, 63KA 3PH DB ISOLATOR WITH 1ES | 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S | 23 | EA | consigneefaridabad3 | 365 |
| 2 | 245KV, 1600A, 50KA, 3PH DB ISOLATOR WITH 1ES | 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S | 5 | EA | consigneefaridabad3 | 365 |
| 3 | 245KV, 1600A, 50KA, 3PH DB ISOLATOR WITH 2ES | 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S | 5 | EA | consigneefaridabad3 | 365 |
| 4 | 245KV,1600A,50KA 3PH DB TANDEM ISOLATOR | 245KV, 1600 A, 50KA, 3-PHASE, DOUBLE BREAK TANDEM ISOLATOR WITHOUT E/S | 10 | EA | consigneefaridabad3 | 365 |
| 5 | SURGE ARRESTER,1 PH,336KV | 336kV Surge Arrester (1-phase) | 15 | EA | consigneefaridabad3 | 365 |
| 6 | SURGE ARRESTER,1 PH,216KV | 216kV Surge Arrester (1-phase) | 15 | EA | consigneefaridabad3 | 365 |
| 7 | 420KV, 1PH BUS POST INSULATOR | 420 kV, 1 phase Bus Post Insulator (except for Line Traps) | 30 | EA | consigneefaridabad3 | 365 |
| 8 | 245KV, 1PH BUS POST INSULATOR | 245 kV ,1 phase Bus Post Insulators (except for Line Traps) | 50 | EA | consigneefaridabad3 | 365 |
| 9 | SUP, ERECTION, TESTING 420KV ISO | Supervision of Erection, Testing and comissioning of 420kV, 3-Phase Isolator with One Earth Switch | 23 | Set | consigneefaridabad3 | 365 |
| 10 | SUP, ERECTION, TESTING 245KV ISO 1 ES | Supervision of Erection, Testing and comissioning of 245kV, 3-Phase Isolator with One Earth Switch | 5 | Set | consigneefaridabad3 | 365 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3703365.pdf
GEM_BID
section-project_merged_2022-08-22-12-05-11_f7b4f413bf0c989fb215c72591781fe8.pdf
BOQ
boq_isolator_2022-08-22-12-05-11_39fb4fe65d52ff8ff57113b82b707f02.csv
BOQ
1661151372.pdf
OTHER
BuyerATC_fcae8892-112f-4edf-93e51661152169438_buyergurgaon1.docx
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid