Tender Value
₹68.5 L
EMD Value
₹1.4 L
Closing Date
27 Aug 2026, 4:00 pm2d left
The Addl. C.E. and Project Manager, TCFHP, WBSEDCL
Office of the Addl. C.E. and Project Manager, TCFHP, WBSEDCL, Township Complex, Phansidewa
Thorough Interior Civil Renovation and Allied Works of Administrative Building of Teesta Canal Fall Hydel Project at Phansidewa, Dist Darjeeling.
2026_WBSED_1035941_1
WBSEDCL/TCFHP/202627/06 Dt 04.08.2026
Open Tender
CIVIL WORKS
Percentage
545 days
Administrative Building, TCFHP, WBSEDCL Phansidewa
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.4 L
12 Aug 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. in Ground floor. | 10 | CUM | 451.47 | ₹4,514.7 |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In 1st floor. | 5 | CUM | 501.97 | ₹2,509.85 |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In 2nd floor. | 5 | CUM | 552.47 | ₹2,762.35 |
| 4 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. in Ground floor. (b) above 150 mm. thick | 5 | CUM | 1,431.17 | ₹7,155.85 |
| 5 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. in 1st floor. (b) above 150 mm. thick | 5 | CUM | 1,481.67 | ₹7,408.35 |
| 6 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In 2nd floor. (b) above 150 mm. thick. | 5 | CUM | 1,532.17 | ₹7,660.85 |
| 7 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars Ground Floor. | 3 | CUM | 1,975.56 | ₹5,926.68 |
| 8 | In 1st Floor. | 3 | CUM | 2,026.06 | ₹6,078.18 |
| 9 | in 2nd Floor. | 2 | CUM | 2,076.56 | ₹4,153.12 |
| 10 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. In Ground floor. | 180 | SQM | 50.5 | ₹9,090 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_2545691.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].