Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAdmitted-Finance | ₹18.0 L | L1 | Admitted-Finance |
| 2 | L2₹19.6 LAdmitted-Finance NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹19.6 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOHAN AGENCIES L1 | KR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00NCTPS–I-CM Circle– CM-I- Improvement works to the Junction Tower No.52 located at ICHS area inside NCTPS-I premises. | |||||
| 1.01 | Dismantling of Doors, windows and Sunshade removal of frames, hinges and fastenings etc., complete including cost labour, equipments, lead, lift, transportation etc., complete and devoluted to central stores as instructed by the Engineer at site. | 18 | sqm | 159 ₹2,862 | 165 ₹2,970 |
| 1.02 | Removal of over burden earth by deplying earth moving machinery for desilting channel having a width of 3m – 10m including cost of Jungle clearance , transporting the excavated earth , silt/soil beyond 2 KM lead through tractor of other machineries , materials , lead , lift etc., complete as directed by the Engineer at site | 119 | cum | 117 ₹13,923 | 125 ₹14,875 |
| 1.03 | Providing brick work in CM 1:5 using fly ash brick/second class table moulded country bricks , including finishing , curing etc., complete complying with standard specification , including the cost of labour , lead , lift , scaffolding , transportation etc., complete as instructed by the Engineer at site. | 2 | cum | 6,599 ₹13,198 | 7,000 ₹14,000 |
| 1.04 | Earth work excavation in hard stuff clay , stiff black cotton soil , hard red earth , shale , muram , gravel , earth mixed with small size boulders and hard gravel soil with initial lead of 10 m abd lift of 2m foundation in trenches etc., complete as instructed by the Engineer at site. | 11 | cum | 111 ₹1,221 | 130 ₹1,430 |
| 1.05 | Providing stone dust including cost of all materials , labour , lead,lift etc., complete as directed by the Engineer at site. | 11 | cum | 929 ₹10,219 | 1,100 ₹12,100 |
| 1.06 | Providing PCC 1:2:4 using 12 to 20 mm HBG metal including cost of all materials , labour, lead, lift etc., complete as directed by the Engineer at site. | 89 | cum | 7,529 ₹6,70,081 | 8,000 ₹7,12,000 |
| 1.07 | Plastering with cement mortar 1:3 20 mm thick in all floors including the cost and conveyance of all materials to site and labour charges etc., complete complying with standard specification (S.I 309) including all cost of labour , lead. lift scaffolding transportation etc., complete as instructed by the Engineer at site .
a)Plastering | 26 | sqm | 619 ₹16,094 | 725 ₹18,850 |
| 1.08 | b)Sunshade | 47 | sqm | 699 ₹32,853 | 800 ₹37,600 |
| 1.09 | Providing epoxy resin concrete bonding agent with NITO bond EP or equivalent to the surface where concrete is to be provided including cost of all materials labour , lead, lift , T&P etc., complete | 39 | sqm | 1,069 ₹41,691 | 1,150 ₹44,850 |
Tender Value
₹21.7 L
EMD Value
₹21,700
Closing Date
4 Jul 2025, 2:00 pmClosed
SE/CM/NCTPS-I
CE/NCTPS-I,Chennai-120
Improvement works to the Junction Tower No 52 located at ICHS area inside NCTPS I premises.
2025_EB_569945_1
CE /NCTPS-I/SE/ CM/34/2025-26
Open Tender
Civil Works
60 days
CE/NCTPS-I
refer tender document
2 documents required · 2 mandatory
₹0
₹21,700
Yes
13 Feb 2026
17 Jun 2025
5 Jul 2025
17 Jun 2025
4 Jul 2025
17 Jun 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid