Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.4 L+₹1,299 (0.54%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.7 L+₹26,299 (10.8%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S KHAN BROTHERS L2 | XCELL ELECTRICALS L1 | M/s ZAHID CONTRACTORS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 100 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, Al. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 1 | No. | 2,05,000 ₹2,05,000 | 2,20,000 ₹2,20,000 | 1,75,000 ₹1,75,000 Lowest |
| 2.00 | Supply , installation ,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A confirming to ISI specification | 1 | set | 15,000 ₹15,000 | 12,000 ₹12,000 | 10,000 ₹10,000 Lowest |
| 3.00 | Supply , installation ,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | set | 12,000 ₹12,000 | 8,000 ₹8,000 Lowest | 80,000 ₹80,000 |
| 4.00 | Supply , installation ,testing & commissioning of Sundry items like Aluminium lugs, Jumpers, binding Tape, | 1 | LS | 9,000 ₹9,000 | 1 ₹1 Lowest | 1,000 ₹1,000 |
| 5.00 | Supply & fixing of GI nuts and bolts of sizes | 15 | Kgs | 190 ₹2,850 | 170 ₹2,550 Lowest | 190 ₹2,850 |
Tender Value
₹2.4 L
EMD Value
₹4,900
Closing Date
3 Oct 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Upgradation of Transformr at Jundipora Marathgam under District Capex Budget (PRI) 2025-26 of ED Handwara
2025_PDD_288067_1
e NIT 42 of 2025-26
Open Tender
Electrical Works
Turn-key
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹500
Office of Executive Engineer ED Handwara
₹4,900
13 Oct 2025
13 Sept 2025
4 Oct 2025
15 Sept 2025
3 Oct 2025
15 Sept 2025
Amount
Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 100 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, Al. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable.
Supply , installation ,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A confirming to ISI specification
Supply , installation ,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply , installation ,testing & commissioning of Sundry items like Aluminium lugs, Jumpers, binding Tape,
Supply & fixing of GI nuts and bolts of sizes
M/S KHAN BROTHERS (BID ID -2565133)
M/s ZAHID CONTRACTORS (BID ID -2565836)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .