Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L1₹9.1 LAccepted-Finance | L1 | Accepted-Finance Admitted |
Tender Value
₹9.2 L
EMD Value
₹10,000
Closing Date
20 Dec 2022, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER VP
BDO OFFICE VEPPANAPALLI
Krishnagiri Dt Veppanapalli Block 2 Nos of works Nursery arrangements Lakkapethanapalli Threshing floor at Kuppachiparai Village Kuppachiparai Panchayat Package No VPN-AGAMT-16
2022_RDTN_270541_1
ROC NO_1706_22_E1_DT_15_11_22
Open Tender
Civil Works - Others
Item Rate
180 days
BLOCK DEVELOPMENT OFFICE VEPPANAPALLI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
BDO OFFICE VEPPANAPALLI
20 Jan 2023
7 Dec 2022
20 Dec 2022
7 Dec 2022
20 Dec 2022
7 Dec 2022
14 Dec 2022
Amount
1.Providing Green net arrangements and fencing for Moringa nursey at Lakkapathalapalli Village H/O Kuppachiparai - 1.450/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour chagres for mixing, laying, cmpacting and curing etc., complete.
Supply and erection of centering for sides and soffits including all labour charge
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply & fixing of Barbed wire including all cost and conveyance etc., all complete
Provision for erection charges for Precast concrete vertical post including all labour charges etc complete.,
Provision for tieing the vertical post including all labour charges
Provision for Green Net Shed including all labour charges
Provision for Grill Gate including all cost and all labour charges
Provision for Name Board Charegs
2.Construction of Thershing floor at Kuppachiparai Village H/O Kuppachiparai (15m to 15m) - Rs.7.740/- Lakhs
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc.,
Filling the basement with excavated earth including all cost and conveyance etc., all complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Roofing with best quality Tuflon sheet
Supplying and fixing 50 mm medium GI pipe including the cost of conveyance of all materials to site and all labour charges etc complete
Providing bitumen Felt 15mm thick pad
Provision for Soak Pit
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Towards cost supply and filling of 40mm HBG metal including cost and conveyance of men and materials etc., all complete
Towards cost supply and filling of 20mm Brick jelly including cost and conveyance of men and materials etc., all complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supply and fixing of 4" dia pvc pipe including all cost and conveyance of men and materials etc., all complete
4" PVC pipe 110mm dia
Provision for Name Board Charegs
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
C.Saravanakumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .