Tender Value
₹25.0 Cr
EMD Value
₹25.7 L
Closing Date
27 Jun 2026, 11:00 am
AGM office sewerage division US Club Shimla
AGM office sewerage division US Club Shimla
with all contingent civil, including staff quarter, electrical, mechanical, piping and instrumentation works with three months trial run including three year defect liability period and operation and maintenance of entire system for 5 years.
2026_SJPNL_135814_1
SJPNL/sewerage/NIT/629-32
Open Tender
Civil Works
455 days
Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹30,000
₹25.7 L
MD office SJPNL US Club Shimla
5 Jun 2026
5 Jun 2026
27 Jun 2026
5 Jun 2026
27 Jun 2026
5 Jun 2026
5 Jun 2026 - 15 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Submission and approval of surveys, Soil Investigation, Design, Working including all layout, sections, typical details Shop drawings, as built drawings….etc. complete for all components of works 1.4 MLD STP Dhalli-II at Ghati Mohanpur based on SBR technology including all auxillary buildings / structural and all allied works as mentioned in tender document. Contractor shall submit working drawing and implementation schedule as per priority given by Engineer-In-charge for approval. Payment shall be released on prorata basis only after approvalof working Drawings as per implementation schedule. Complete as per direction of Er-in Charge.(Schedule -A) | 1 | L.S | - | - |
| 2 | Construction, Site development, testing, commissioning and giving satisfactorily trials of 1.4 MLD STP of SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, (Including transformer) Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards pH 6.5- 8.5, BOD < 10ppm, COD<50ppm, TSS < 10ppm, NH4-N <5ppm, N-Total<10ppm, Total Phosphorus (PO4-P) =1 ppm, Faecal Coliforms <100 MPN/100ml and Total residual Chlorine =1 ppm to get recyclable quality of water for Industrial / agricultural purposes. .All units shall be interconnected with administration building by suitable or RCC overhead walkways, boundary wall of average 4.0 mtr complete fencing (Campus should covered with boundary wall and fencing) at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA complete from Primary, secondary and Tertiary treatment etc price of items including GST and payment will be released on prorata basis complete as per Direction of Er-in Charge.(Schedule -B) | 1.4 | Per MLD | - | - |
| 3Operation and Maintenance cost of 1.4 MLD STP including entire Network of 27 Km of various diameter for 5 Years which includes cost of manpower, Chemicals and consumables, Residual disposal charges (Transportation) and repair & maintanence excluding three years defects liability period (from 4th year of Operation and Maintanence contract complete in all respect as per direction of Er-in-Charge.(Schedule -C) | |||||
| 3.01 | For 1st year | 1 | Year | - | - |
| 3.02 | For 2nd year | 1 | Year | - | - |
| 3.03 | For 3rd year | 1 | Year | - | - |
| 3.04 | For 4th year | 1 | Year | - | - |
| 3.05 | For 5th year | 1 | Year | - | - |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer- in-charge. | 630 | Cum | - | - |
| 5 | Excavation in foundation, trenches etc., in earth work (in all kind of soil )such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock i/c cutting of top of metelled road etc., upto all heights stacking the excavated earth not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to all leads and lifts etc., complete in all respect. | 9,533.6 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.24 MB
CoverPage.pdf
Tender Documents • 0.18 MB
BiddingForms.pdf
Tender Documents • 1.09 MB
Form6.pdf
Tender Documents • 0.62 MB
ExtentofWorkForDesignConstructionofNewSTP.pdf
Tender Documents • 0.88 MB
FunctionalGuaranteesofthePlant.pdf
Tender Documents • 0.26 MB
InspectionTestingandCommissioningRequirements.pdf
Tender Documents • 0.61 MB
layout.pdf
Tender Documents • 0.04 MB
PerformanceCriteriaFile.pdf
Tender Documents • 0.30 MB
PreambletoPriceBid.pdf
Tender Documents • 0.41 MB
SubmissionToBeMadeonAwardofContarct.pdf
Tender Documents • 0.64 MB
TechnicalSpecifications.pdf
Tender Documents • 5.95 MB
VoLIIBCondofContOM.pdf
Tender Documents • 0.87 MB
DNITConditions.pdf
Tender Documents • 0.20 MB
Section1Mod.pdf
Tender Documents • 0.33 MB
BOQ_201096.xls
BOQ • 0.25 MB
Instructionstobidders.pdf
Tender Documents • 0.50 MB
Form12.pdf
Tender Documents • 1.29 MB
ParticularConditionsofContract.pdf
Tender Documents • 0.33 MB
Index.pdf
Tender Documents • 0.10 MB
DHALI.pdf
Tender Documents • 0.37 MB
ProjectDescription.pdf
Tender Documents • 0.23 MB
responsetoprebid.pdf
Tender Documents • 9.16 MB
Download all tender documents and submit your bid