Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC FIRST LOWEST AND GST EXCLUSIVE | |
| 2 | L2₹4.4 L+₹21,000 (5.05%)Rejected-Finance BSA COLLAGE ROAD DWARIKA PURI MATHURA MATHURA UTTAR PRADESH 281001 | MATHURA | UTTAR PRADESH | 281001 | L2 | Rejected-Finance Second Lowest | |
| 3 | L3₹4.8 L+₹61,000 (14.7%)Rejected-Finance | L3 | Rejected-Finance Third Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
14 Jul 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, 2ND CONSTRUCTION DIVISION (E/M
U P JAL NIGAM, 4/4, SANJAY PLACE, AGRA
NECESSARY REPAIRING WORK AT SIKANDRA ZPS (IN 144 MLD WTP CAMPUS), BODLA-II CLEAR WATER PUMPING STATION AND BODLA-III CLEAR WATER SUMPING STATION IN DISTRICT AGRA
2020_UPJNM_490574_1
689/NIVIDA/87 DATE 02.07.2020 - (BODLA)
Open Tender
Water Supply
Item Rate
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER, 2 C.D (E/M)U P JAL NIGAM, AGRA
₹5,000
19 Sept 2020
7 Jul 2020
16 Jul 2020
7 Jul 2020
14 Jul 2020
7 Jul 2020
120 days
Amount
Sikandra Zonal Pumping Station (in 144 MLD WTP campus)
Dismantaling of required parts of 2 nos. Pump & Motor set, 1 no. sluice valve & 1 no. Reflux valve from site to workshop.
All loading, carting, unloading of above material to & fro workshop & site complete in all respect.
Rewinding with installation of 75 HP induction motor no. 1 & 2 including, bearing, rachet coupling and all required material, T&P complete in all respect.
Repairing/Overhauling with installation of 5900 lpm, 36 mt head 2 nos. VT Pump set including spider, rubber bush, Nut bolt, Impeller turning, all required material and T&P etc. complete in all respect.
Repairing with installation of required parts of 2 nos. sluive valve including packing, nut bolt and all required material & T&P etc. complete in all respect.
Repairing with installation of required parts of 2 nos. Reflux valve including threading, packing nut bolt and all required material & T&P etc. complete in all respect.
Repairing / Overhauling with installation of required parts of 2 nos. 75 HP ATS Starter including Transformer oil and all material required.
Painting as per site requirement
Bodla-II (Central Park) Clear Water Pumping Station
Dismantling of required parts of 2 nos. Pump & motor set, 2 nos. sluice valve, 2 nos. Reflux valve & ATS Starter from site to workshop.
All loading, carting, unloading of above material to & fro workshop and site complete in all respect.
Repairing of required parts of 2 nos. 60 HP induction motor including rachet, coupling, socket and all required T&P complete in all respect.
Repairing/Overhauling with installation of required parts of 2 nos. 5000 lpm, 35.5 mt head VT Pump set including spider, rubber bush, nut bolt impeller turning, all required material and T&P etc. complete in all respect.
Repairing with installation of required parts of 2 nos. sluive valve including packing, nut bolt and all required material & T&P etc. complete in all respect.
Repairing with installation of required parts of 2 nos. Reflux valve including threading, packing nut bolt and all required material & T&P etc. complete in all respect.
Repairing / Overhauling with installation of required parts of 2 nos. 60 HP ATS Starter including Transformer oil and all material required.
Repairing with installation of LT switchgear panel including labour, material and required T&P. complete in all respect.
Repairing of Distribution / fuse Panel complete including required material
Painting as per site requirement
Bodla-III Clear Water Pumping Station
Dismantling of required parts of 1 no. ATS Starter from site to workshop.
All loading, carting, unloading of above material to & fro workshop and site complete in all respect.
Repairing / Overhauling with installation of required parts of 1 no. 25 HP ATS Starter including Transformer oil and all material required.
Repairing with installation of LT switchgear panel including labour, material and required T&P. complete in all respect.
Painting as per site requirement
PUMPS ENGINEERS AND TRADERS
Vatavaran techno
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .