| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹73.2 LAccepted-AOC 3 336 AROKIAMATHA STREET N PANJAMPATTI PIN 624303 | N PANJAMPATTI | DINDIGUL | TAMIL NADU | 624303 | ₹73.2 L | 1 | Accepted-AOC lesser the estimate rate |
| 2 | 2₹74.1 LRejected-Finance | ₹74.1 L | 2 | Rejected-Finance higher the estimate rate |
| Sl No | Description | Qty | Unit | G.UDHAYAKUMAR L2 | ANBARASU CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. | 913 | M3 | 166 ₹1,51,558.17 | 164.5 ₹1,50,188.66 |
| 2.00 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | 129 | M3 | 5,150 ₹6,64,365.45 | 5,114.25 ₹6,59,753.59 |
| 3.00Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Drain Side wall | |||||
| 4.00 | Side wall | 352.5 | M3 | 10,400 ₹36,65,974.42 | 10,352 ₹36,49,054.53 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,
Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel
reinforcement and G.I. binding wire, wastage etc. complete complying with standard
specification and as directed by the departmental officers.(Contractor has to make his
own arrangements for the supply of steel reinforcement and binding wire) | 9,082.53 | Kg | 99 ₹8,99,170.77 | 92.75 ₹8,42,404.94 |
| 6.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB | 121.1 | M3 | 10,900 ₹13,19,994.8 | 10,882.75 ₹13,17,905.81 |
| 7.00 | Supply and fixing of SFRC Manhole cover (0.60m x 0.60m) including cost of man hole cover conveyance to the site and labour charges for fixing etc. complete complying with standard specification | 232 | No | 2,709 ₹6,28,477.16 | 2,701 ₹6,26,621.2 |
| 8.00 | Removal of Excavated Excess Earth away from the site to 3 KM including loading and transportation charges etc, complete as per standard specification. For 1m3 | 731 | M3 | 105 ₹76,755.08 | 103.25 ₹75,475.83 |
Tender Value
₹88 L
EMD Value
₹88,000
Closing Date
2 Mar 2026, 3:00 pmClosed
commissioner
13,sendurai main rd,elil nagar,dindigul
Library Cess Fund-Construction of Drain and Culverts at Devar lane (078036S220), Seeni Rawther cross lane(078036R1011),Vellalar Street(078037R789), Sandai Road main (078037R791), Pon Srinivasan Nagar (078038R1019) in Ward Nos.36,37,38
2026_MAWS_663113_5
2855/2023/E4
Open Tender
Civil Works
13, sendurai main rd, elil nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹88,000
13,sendurai main rd,elil nagar,dindigul
14 May 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
25 Feb 2026
Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification.
Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications
Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Drain Side wall
Side wall
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB
Supply and fixing of SFRC Manhole cover (0.60m x 0.60m) including cost of man hole cover conveyance to the site and labour charges for fixing etc. complete complying with standard specification
Removal of Excavated Excess Earth away from the site to 3 KM including loading and transportation charges etc, complete as per standard specification. For 1m3
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.72 MB
BOQ_796110.xls
BOQ • 0.35 MB
techfive.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid