| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹45.1 L+₹1.1 L (2.59%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAJPATI CONSTRUCTION L2 | JYOTI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 0.00GENERAL SUMMARY | |||||
| 1.00Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | |||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/38/2026 Sheet No. 1/2, CWE/ARCH/38/2026 Sheet No. 2/2 and Construction of Guard Room with Toilet facility as per architectural drawings, structural drawing, TD drawings, schedule of finishes & given specifications built in permanent specification with RCC frames construction including ATT, WPT mosquito proofing, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor. | 1 | Block | 24,94,000 ₹24,94,000 Lowest | 29,00,000 ₹29,00,000 |
| 2.00 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,18,000 ₹1,18,000 | 73,500 ₹73,500 Lowest |
| 3.00 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,18,000 ₹1,18,000 | 85,000 ₹85,000 Lowest |
| 4.00 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 46,000 ₹46,000 | 36,000 ₹36,000 Lowest |
| 5.00 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,09,000 ₹1,09,000 | 90,000 ₹90,000 Lowest |
| 6.00 | Lump sum price worked out by the contractor for ROAD/PATH/CULVERTS WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,53,000 ₹2,53,000 | 1,75,000 ₹1,75,000 Lowest |
| 7.00 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,54,000 ₹1,54,000 | 1,25,000 ₹1,25,000 Lowest |
| 8.00 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part- VIII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 24,220 ₹24,220 Lowest | 25,000 ₹25,000 |
Tender Value
₹41.6 L
EMD Value
₹83,140
Closing Date
20 Jul 2026, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
PROVN OF GUARD ROOM WITH TOILET FACILITY AND PERIMETER FENCING AT MAIN GATE OF 102 ENGR REGT UNDER GE BHOPAL
2026_MES_771983_1
84269/E8
Open Tender
Civil Works
Item Rate
180 days
Bhopal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE Bhopal
₹83,140
Yes
23 Jul 2026
13 Jun 2026
22 Jul 2026
13 Jun 2026
20 Jul 2026
2 Jul 2026
13 Jun 2026 - 2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0GENERAL SUMMARY | |||||
| 1Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | |||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/38/2026 Sheet No. 1/2, CWE/ARCH/38/2026 Sheet No. 2/2 and Construction of Guard Room with Toilet facility as per architectural drawings, structural drawing, TD drawings, schedule of finishes & given specifications built in permanent specification with RCC frames construction including ATT, WPT mosquito proofing, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor. | 1 | Block | - | - |
| 2 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,12,877.15 | ₹1,12,877.15 |
| 3 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,10,299.7 | ₹1,10,299.7 |
| 4 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 40,827.3 | ₹40,827.3 |
| 5 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,03,174.19 | ₹1,03,174.19 |
| 6 | Lump sum price worked out by the contractor for ROAD/PATH/CULVERTS WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,51,061.6 | ₹2,51,061.6 |
| 7 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,50,878.14 | ₹1,50,878.14 |
| 8 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part- VIII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 23,358.82 | ₹23,358.82 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_864449.xls
BOQ • 0.24 MB
84269TenderDocuments.pdf
Tender Documents • 1.51 MB
prepricedschdule_84269.pdf
Additional Documents • 0.33 MB
Alldrawings_84269.pdf
Additional Documents • 5.68 MB
DateCorrigendum.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .