Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-Finance | ₹12.3 L | 1 | Accepted-Finance Tender Rate below |
| 2 | 2₹12.4 LRejected-Finance | ₹12.4 L | 2 | Rejected-Finance Tender Rate above |
| 3 | 3₹12.5 LRejected-Finance | ₹12.5 L | 3 | Rejected-Finance Tender Rate above |
Tender Value
₹12.3 L
EMD Value
₹1,534
Closing Date
7 May 2026, 2:00 pmClosed
EXECUTIVE OFFICER
office nagar palika parishad auraiya
15va vity ayaog ke antrgat mohala padeen darwaja uttri me manoj ke makan se puttan pal ke makan tak and sarvesh pal ke makan se rajesh yadav ke makan tak avav ashok ke makan se mukesh mishra ke makan tak nali avav nalli and interlocking nirman kary
2026_DOLBU_1137121_4
266/nppnv/2025-26 date 13-05-2026
Open Tender
Civil Works
60 days
NPPAURAIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,534
EXECUTIVE OFFICER
₹1,534
11 May 2026
15 Apr 2026
7 May 2026
15 Apr 2026
7 May 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in embankment in ordinary Soil including lift 1.50m lead 30mwith cartage of earth from 6km to site including loading unloading etc all complete mechanically . 253+231(a) | 1 | Cum. | - | - | BI01010001010000000000000515BI01000011131 |
| 2 | Excavation in foundation in ordinary soil (loam clay, or sand) including lift upto 1.5 metre and lead upto 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space bwtween the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge of 30 m from the foundation trenches. | 1 | Cum. | - | - | BI01010001010000000000000515BI01000011132 |
| 3 | Providing and laying base concrete 1:4:8 Cement c/sand and 40mm gauge ston ballast including supply of all material labour T&P etc all complete S.I. 281 | - | Cum. | - | - | BI01010001010000000000000515BI01000011153 |
| 4 | R.C.C. work for drain 1:2:4 cement C/ sand and app stone grit including centering shuttering Excluding rein forcemeant supply of all material labour T&P all complete s. I . 283 | 1 | Cum. | - | - | BI01010001010000000000000515BI01000011164 |
| 5 | R.C.C. work for slab1:2:4cement c/sand and stone grit including rein for cement and its binding etc all complete S.I.284 | 1 | Cum. | - | - | BI01010001010000000000000515BI01000011175 |
| 6 | Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification Clause 401 | - | Cum. | - | - | BI01010001010000000000000515BI01000011186 |
| 7 | Providing and laying 80mm thick ISI ruber moulded precat interlocking cement Concrete pre pavers manufactures By automatic electro hydraulically Operated pavers strength 400kg/cm2 making machine of appropriate size and shape over 80 mm thick average compacted c/sand joint of 3mm thick filled by fine sand including leveling temping and sweeping etc. all complete | - | Sqm | - | - | BI01010001010000000000000515BI01000011197 |
| 8 | Cement concrete with 4 cm gauge approved stone ballast approved coarse sand cement in the proportion of 4:2:1 including supply of all material T&P etc. required for proper completion of work. S.I,. No279 a | - | Cum. | - | - | BI01010001010000000000000515BI01000011208 |
| 9 | Mild steel or iron work such as RB or R.C.C. work including etc all complete .S.I. 504 | - | Qtl | - | - | BI01010001010000000000000515BI01000011219 |
| 10 | Ist class brick work in 1:4 cement and c /sand of 1.25 F.M. mortar in foundation plinth including supply of all materials, labour and T&P etc. required for proper completion of work. N.S. | - | Cum. | - | - | BI01010001010000000000000515BI010000112211 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_2123378.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid