Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L1 | Accepted-Finance being lowest | |
| 2 | L2₹1.8 L+₹2,200 (1.24%)Rejected-Finance MAIN CHOWK TALAB TILLO JAMMU | ANANTNAG | JAMMU AND KASHMIR | 192101 | L2 | Rejected-Finance not lowest | |
| 3 | L3₹1.9 L+₹8,500 (4.80%)Rejected-Finance NOT AVAILABLE | L3 | Rejected-Finance not lowest |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
24 Jan 2024, 2:00 pmClosed
Executive Engineer
MID JAMMU
Strengthening /maintenance of water regulatory gates at various locations along with other closure work on Ranbir canal.
2024_IFC_243039_1
MID/J/e-NIT/2023-24/140
Open Tender
Repair and Maintenance Works
Item Wise
15 days
khandwal gate, belicharana and others
as per enit
8 documents required · 8 mandatory
₹200
EXECUTIVE ENGINEER MID JAMMU
₹4,000
Yes
2 Feb 2024
16 Jan 2024
25 Jan 2024
16 Jan 2024
24 Jan 2024
18 Jan 2024
Strengthening /maintenance of water regulatory gates
a) Gates of Khandwal (5’-0” X 3.0”) Extracting the gear mechanism .Servicing/Repairs to winch machine by way of dismantling it from the frame channel of gate by unscrewing it ,taking it to workshop in mechanical transport and fitting of metal shims by way of grinding the surface of winch machine and welding it to obstruct the translational motion of worm ,fitting of winch machine greasing & oiling using standard quality grease after removing the old grease and washing cleaning with kerosene oil or any other solvent to make it dust free. , Providing /fitting of new bearings, and checking for alignment after greasing the threaded portion fixing it back to winch machine then after greasing the threaded portion fixing it back to winch machine. The job includes replacement of nut bolts. Straightening of stem rod at workshop by heating and then pressing it in a die. Cleaning the guide channels with kerosene oil to make it dust free and then greasing it. Job also includes complete painting of winch machine and gate by cleaning the surface by sand paper, scratching the surface of gate to make it smooth and applying two coats of paint, checking the up and down movement of gate providing of new gate key of appropriate size .The job includes cost of material, checking the up and down movement of gate hires charges of crane and other tools and tackles required for the job including labour charges. b) Distributory Gate of Belicharana (5’-3” X 9’-10”) Extracting the gear mechanism .Servicing/Repairs to winch machine by way of dismantling it from the frame channel of gate by unscrewing it ,taking it to workshop in mechanical transport and fitting of metal shims by way of grinding the surface of winch machine and welding it to obstruct the translational motion of worm ,adjustment of winch machine by rotating it fitting at suitable position, boring the hole of suitable diameter on channel to accommodate nut and bolt assembly fitting of winch machine on new base plate 10 mm and fitting of new main gear and bearing greasing & oiling using standard quality grease after removing the old grease and washing cleaning with kerosene oil or any other solvent to make it dust free. The job includes replacement of nut bolts. Cleaning the guide channels with kerosene oil to make it dust free and then greasing it. Job also includes complete painting of winch machine and gate by cleaning the surface by sand paper, scratching the surface of gate to make it smooth and applying two coats of paint, checking the up and down movement of gate The job includes cost of material, checking the up and down movement of gate hires charges of crane and other tools and tackles required for the job including labour charges. c) Gate of Mandal Khul (4’-6” X 6’-0”) Replacement of 1 no. worm along with gate handle of winch machine by way of dismantling of winch machine of using manual labour and other tools & tackles after dismantling of winch machine and lubricating the frame. Cleaning of Gate leaf, frame channel with suitable solvent to make it dust free and then lubricating the gate leaf channels properly. Preventive maintenance to winch machine by way of dismantling the winch machine ,providing of 1 no. worm gear greasing & oiling using standard quality grease after removing the old grease and washing / cleaning with kerosene oil or any other solvent to make it dust free. Straightening of the stem rod for proper fitting with mechanical processes The job includes complete painting of winch machine and gate leaf by cleaning the surface of machine by sand paper, scratching the surface to make it smooth and applying with two coats of paint ,checking the up and down movement of gate ,fabrication/providing of 1 no gate operating handle cost of material, hires charges of crane and other tools and tackles required for the job including labour and shifting charges. C/ job 01 No. d) Escape Gates of Belicharana (5’-3” X 9’-10”) Extracting the gear mechanism .Servicing/Repairs to winch machine by way of dismantling it from the frame channel of gate by unscrewing it ,taking it to workshop in mechanical transport and fitting of metal shims by way of grinding the surface of winch machine and welding it to obstruct the translational motion of worm ,adjustment of winch machine by rotating it fitting at suitable position, boring the hole of suitable diameter on channel to accommodate nut and bolt assembly on new 10 mm base plate also includes drilling of holes on it , fitting of winch machine and fitting of new bearings greasing & oiling using standard quality grease after removing the old grease and washing cleaning with kerosene oil or any other solvent to make it dust free. The job includes replacement of nut bolts. Cleaning the guide channels with kerosene oil to make it dust free and then greasing it. Job also includes complete painting of winch machine and gate by cleaning the surface by sand paper, scratching the surface of gate to make it smooth and applying two coats of paint, checking the up and down movement of gate .providing of new gate handles, bearings and repair to gate sheet by welding and grinding the bottom channel to make it rust free . Straightening of the stem rod at workshop by heating and then pressing with due mechanical processes The job includes cost of material, checking the up and down movement of gate hires charges of crane and other tools and tackles required for the job including labour charges. Complete job 03 Nos e) Main Gate of Banzalla (3’-6” X 3’-6”) Preventive maintenance to winch machine by way of dismantling the winch machine ,providing of new worm and gear assembly greasing & oiling using standard quality grease after removing the old grease and washing / cleaning with kerosene oil or any other solvent to make it dust free. Straightening of the stem rod for proper fitting with due mechanical processes The job includes complete painting of winch machine and gate leaf by cleaning the surface of machine by sand paper, scratching the surface to make it smooth and applying with two coats of paint ,checking the up and down movement of gate ,fabrication/providing of 1 no gate operating handle cost of material, hires charges of crane and other tools and tackles required for the job including labour and shifting charges. Complete job 01 No f) Gate of Thalwal Khul (4'-6" x 6'-6") Replacement of 1 no. bearing along with gate handle and protection box of winch machine by way of dismantling of winch machine of using manual labour and other tools & tackles after dismantling of winch machine and lubricating the frame. Cleaning of Gate leaf, frame channel with suitable solvent to make it dust free and then lubricating the gate leaf channels properly. Preventive maintenance to winch machine by way of dismantling the winch machine ,providing of 1 no. bearing greasing & oiling using standard quality grease after removing the old grease and washing / cleaning with kerosene oil or any other solvent to make it dust free. Straightening of the stem rod for proper fitting with due mechanical processes The job includes fitting of 1 no bearing along with complete painting of winch machine and gate leaf by cleaning the surface of machine by sand paper, scratching the surface to make it smooth and applying with two coats of paint ,checking the up and down movement of gate ,fabrication/providing of 1 no gate operating handle cost of material, hires charges of crane and other tools and tackles required for the job including labour and shifting charges. C/ job g) Gate of Sohanjana(3’-6” X 3’-6”) Extracting the gear mechanism .Servicing/Repairs to winch machine by way of dismantling it from the frame channel of gate by unscrewing it ,taking it to workshop in mechanical transport and fitting of metal shims by way of grinding the surface of winch machine and welding it to obstruct the translational motion of worm ,adjustment of winch machine by rotating it fitting at suitable position, boring the hole of suitable diameter on channel to accommodate nut and bolt assembly fitting of winch machine and fitting of new gear set including worm and main gear & oiling using standard quality grease after removing the old grease and washing cleaning with kerosene oil or any other solvent to make it dust free. Fitting of new 4 mm sheet of suitable size and replacing it with old sheet. The job includes replacement of nut bolts. Cleaning the guide channels with kerosene oil to make it dust free and then greasing it. Job also includes complete painting of winch machine and gate by cleaning the surface by sand paper, scratching the surface of gate to make it smooth and applying two coats of paint, checking the up and down movement of gate The job includes cost of material, checking the up and down movement of gate hires charges of crane and other tools and tackles required for the job including labour charges h) Main Gate of belicharana D 9A new (6’-3” X 6’-11”) Extracting the gear mechanism .Servicing/Repairs to winch machine by way of dismantling it from the frame channel of gate by unscrewing it , greasing & oiling using standard quality grease after removing the old grease and washing cleaning with kerosene oil or any other solvent to make it dust free. The job includes replacement of nut bolts. Cleaning the guide channels with kerosene oil to make it dust free and then greasing it. complete painting of winch machine and gate by cleaning the surface by sand paper, scratching the surface of gate to make it smooth and applying two coats of paint, checking the up and down movement of gate . the job includes realignment of gate structure by taking out geat leaf by crane and then assembling it to have proper alignment Straightening of the stem rod at workshop by heating and then pressing with due mechanical processes The job includes cost of material, checking the up and down movement of gate hires charges of crane and other tools and tackles required for the job including labour charges. Complete job 03 Nos
Rebate on Old Parts
Repairs to 300 mm dia foot valve of unit 1 and 3 at LIS Karnailachak
Repairs to 300 mm dia foot valve of unit 1 and 3 by way of dismantling the suction pipe and lifting it by ropes to the head load side and then dismantling the foot valve and taking the foot valves to w/shop for providing and fitting of new machined flapper pins, leather washers, fabrication of new flapper plates and new set of nuts and bolts and repair to strainers. Assembling of foot valve and checking operation without load shifting it to site by using mechanical transport and installation at site. Re-assembling of entire foot valve with suction line of unit 1 and 3 and checking operation.
Rebate on Old Parts
M/S GANPATI ELECTRICAL AND MECHNICAL WORKS
N B Engineering and Electric Works
M/S GANPATI ELECTRICAL AND MECHNICAL WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .