Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.6 LAccepted-AOC AT JAWAHAR NAGAR PO BERMO DIST BOKARO PIN 829104 JHARKHAND | BERMO | BOKARO | JHARKHAND | 829104 | ₹2.6 L | l1 | Accepted-AOC l1 |
| 2 | Rejected-Technical GHUTRI DAFAI HALDIBADI CHIRIMIRI DISTT KOREA C G 497451 | KOREA | CHHATTISGARH | 497451 | - | - | Rejected-Technical l3 |
| 3 | Rejected-Technical | - | - | Rejected-Technical l2 |
| Sl No | Description | Qty | Unit | M/S JAI MAA ENTERPRISES L1 | JAI MAA KALI ENTERPRISES L3 | M/S PRABHAT ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.01 | Erection of metallic pole (above 8 m and upto 10 m) in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. | 16 | no. | 3,970.87 ₹63,533.92 Lowest | 4,080 ₹65,280 | 4,007 ₹64,112 |
| 1.02 | Erection of ACSR conductor of 7/3.35 mm to 7/4.00 diameter and above including binding etc. as required. (13 span x 50 m x 2 wire) = 1300 m x 0.394 kg/m = 512.2 kg | 512.2 | kg | 126.44 ₹64,762.57 Lowest | 130 ₹66,586 | 127 ₹65,049.4 |
| 1.03 | Supplying and erection of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as required. | 12 | set | 669.26 ₹8,031.12 Lowest | 687 ₹8,244 | 675 ₹8,100 |
| 1.04 | Supplying and erection of 100 mm X 110 mm shackle insulator complete with G. I. Bolt, nuts and straps etc. as reqd. | 22 | set | 187.48 ₹4,124.56 Lowest | 192 ₹4,224 | 189 ₹4,158 |
| 1.05 | Supplying and erection of stay set complete (galvanised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, bow tightener, 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required | 9 | no. | 3,547.95 ₹31,931.55 Lowest | 3,645 ₹32,805 | 3,580 ₹32,220 |
| 1.06 | Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required. (50 m x 2 wire x 13 span) x 0.394 kg/m = 512.2 kg + (26 no. Channel Iron = 7.14 kg x 26 = 185.64) kg; Total = 697.84 kg | 697.84 | kg | 41.42 ₹28,904.53 Lowest | 42 ₹29,309.28 | 42 ₹29,309.28 |
| 1.07 | Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required. | 13 | no. | 1,262.22 ₹16,408.86 Lowest | 1,296 ₹16,848 | 1,273 ₹16,549 |
| 1.08 | Supply and providing of 2 x 1.5 sq. mm. Cu wire for connection of light fittings to poles and for control switches | 95 | metre | 39.24 ₹3,727.8 | 40 ₹3,800 | 39 ₹3,705 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
16 Aug 2024, 11:00 amClosed
P.E. (EnM)
Office of the P.O. (Karo OCP), PIN 829104
Re organisation cum diversion of the 220 V lighting OH Lines along the road from Weighbridge no. 5 to the diverted Subhash Nagar Road, along the edge of the Mine, w.r.t. Karo OCP, under BnK Area.
2024_CCL_314344_1
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 33
Open Tender
Electrical and Maintenance Works
Item Rate
5 days
Karo OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
13 Dec 2025
6 Aug 2024
17 Aug 2024
6 Aug 2024
16 Aug 2024
7 Aug 2024
6 Aug 2024 - 16 Aug 2024
Amount
Erection of metallic pole (above 8 m and upto 10 m) in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.
Erection of ACSR conductor of 7/3.35 mm to 7/4.00 diameter and above including binding etc. as required. (13 span x 50 m x 2 wire) = 1300 m x 0.394 kg/m = 512.2 kg
Supplying and erection of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as required.
Supplying and erection of 100 mm X 110 mm shackle insulator complete with G. I. Bolt, nuts and straps etc. as reqd.
Supplying and erection of stay set complete (galvanised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, bow tightener, 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required
Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required. (50 m x 2 wire x 13 span) x 0.394 kg/m = 512.2 kg + (26 no. Channel Iron = 7.14 kg x 26 = 185.64) kg; Total = 697.84 kg
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
Supply and providing of 2 x 1.5 sq. mm. Cu wire for connection of light fittings to poles and for control switches
Total impact of GST for the purpose of CTC
M/S PRABHAT ENTERPRISES
JAI MAA KALI ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .