Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹14.6 L+₹46,631.50 (3.30%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Devi Constructions L1 | Hayagreeva Earth Movers L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantaling the Damaged Brick work in Cement Mortor including all cost etc complete. | 4 | M3 | 270 ₹1,080 Lowest | 290 ₹1,160 |
| 1.10Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.20 | for Tie Beam over Old compound wall | 73 | M2 | 983 ₹71,759 Lowest | 1,000 ₹73,000 |
| 1.30Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | |||||
| 1.40 | Above Basement | 9 | M3 | 8,600 ₹77,400 Lowest | 8,700 ₹78,300 |
| 1.50 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications | 44 | M3 | 6,612 ₹2,90,928 Lowest | 6,700 ₹2,94,800 |
| 1.60 | Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification | 810 | Kg | 100 ₹81,000 Lowest | 110 ₹89,100 |
| 1.70 | Plastering with cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 415 | M2 | 259 ₹1,07,485 Lowest | 265 ₹1,09,975 |
| 1.80 | White washing one coat using best freshly burnt shell lime in all floors including cost of lime blue powder, fevical type gum brushes, scaffolding charges etc., complete complying with standard specifications. | 980 | M2 | 35 ₹34,300 Lowest | 40 ₹39,200 |
| 1.90 | Painting two coats with ready mixed plastic emulsion paint of 1st class quality and of approved color over a priming coat including through scraping clean removal of dirt etc., complete and including necessary plaster of paris putty wherever required | 980 | kg | 240 ₹2,35,200 Lowest | 250 ₹2,45,000 |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
27 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem
Raising the Compound wall at Kamarajar Nagar Colony Ele. School in Division No. 37.
2024_MAWS_428584_1
E6/EST NO.286/B/2023-2024
Open Tender
Civil Works
Lump-sum
60 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,000
12 Nov 2026
21 Feb 2024
27 Feb 2024
21 Feb 2024
27 Feb 2024
21 Feb 2024
Amount
Dismantaling the Damaged Brick work in Cement Mortor including all cost etc complete.
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
for Tie Beam over Old compound wall
Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Above Basement
Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification
Plastering with cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications
White washing one coat using best freshly burnt shell lime in all floors including cost of lime blue powder, fevical type gum brushes, scaffolding charges etc., complete complying with standard specifications.
Painting two coats with ready mixed plastic emulsion paint of 1st class quality and of approved color over a priming coat including through scraping clean removal of dirt etc., complete and including necessary plaster of paris putty wherever required
Painting two coats with best synthetic enamel paint of approved Colour for Old iron works the rate is inclusive of all materials, brushes and scaffolding charges etc., complete complying with standard specification(paint should be got approved by the Departmental Engineer befor use on work.
Supplying and filling in basement with Gravel in layers of 15cm thick including watering and ramming to consolidation
Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 63 mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, stone dust cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,.
Hayagreeva Earth Movers
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .