Loading
Loading…
Loading…
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
25 Jun 2026, 6:00 pm
GE NAGROTA
GE NAGROTA
REPAIR AND MAINTENANCE OF AC PLANT ALONGWITH CONNECTING ITEMS AT VARIOUS LOCATION UNDER GE NAGROTA
2026_MES_768977_1
CANO GEN/TOKEN-45/2026-2027
Open Tender
Electrical and Maintenance Works
240 days
GE NAGROTA
Class D Cat c (i)
9 documents required · 9 mandatory
₹500
GE NAGROTA
₹70,000
Yes
5 Jun 2026
5 Jun 2026
30 Jun 2026
5 Jun 2026
25 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Material and labour for Descaling of condenser tubes required to meet the designed pressure conditions and cooling specifications for desired rate of flow of refrigerant in compressor and water in condenser including circulation of chemical inside tubes and cleaning tubes, provision of new gaskets, in every 03 months etc complete all as specified and directed. Note : Spares required to be measured and paid separately under relevent items. | |||||
| 2.01 | 52 TR capacity at Signal Center | 4 | Each | - | - |
| 2.02 | 52 TR capacity at OPS Room | 4 | Each | - | - |
| 2.03 | 15 TR capacity at 4 ASD | 4 | Each | - | - |
| 3 | Supply and charging compressor oil conforming to IS 4578 or any other relevant IS for synthetic oils (of any make to be approved by GE in writing) including flushing/cleaning of oil chamber etc complete all as specified and directed.
Note: (i) Oil shall be brought by the contractor at site from authorised dealer/manufacturer company in sealed canes of standard packing with test certificate and purchase Vrs.
(ii) Re-filling shall be done in the presence of Engr-in-Charge. | 35 | Ltrs | - | - |
| 4 | Nitrogen testing for the any capacity of compressors including condensing unit and gas piping complete as per the manufacturer instructiions and entire satisfaction complete all as specified and directed.
Note :- (i) Nitrozen pressure should be held with out any drop in pressure inside the unit continue for 24 hrs after leakage testiing required gas will be fill and satisfaction of the Engineer in Charge. | 10 | Job | - | - |
| 5 | S & F in repairs flexible twin core 4076 with copper conductor including connecting fan complete all as specified and directed. | 300 | RM | - | - |
| 6 | Supply and filling Refrigerant gas R-407 of 11 Kg Each cylinder for AC plant compressor complete all as specified and directed. | 12 | Nos | - | - |
| 7 | Supply and filling Refrigerant gas R-22 of 11 Kg Each cylinder for AC plant compressor complete all as specified and directed. | 12 | Nos | - | - |
| 8M&L dismantling electric motor of any make, 3 phase 415V of following capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding as per manufacturer design including varnishing & drying and re-assembling the motor, connecting with proper alignment and testing complete including transporting to workshop for rewinding complete all as specified and directed. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
tender45.pdf
Tender Documents • 1.06 MB
BOQ_862286.xls
BOQ • 1.48 MB
Download all tender documents and submit your bid