Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹15,500
Closing Date
21 Sept 2026, 6:00 pm5d left
Executive Engineer Flood Control Division Kakapora
Flood Control Division Kakapora near police station
Construction of protection work on left side at village Gulbugh RD 6800m Upstream culvert
2026_IFC_322883_4
E-NIT No 08 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Kakapora
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
Executive Engineer Flood Control Division Kakapora
₹15,500
Yes
31 Aug 2026
31 Aug 2026
22 Sept 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 199.56 | cum | 187.3 | ₹37,377.59 |
| 2 | Hand packing stone excluding cost of stones.
in Horizontal on level | 10.15 | cum | 237.9 | ₹2,414.69 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.97 | cum | 5,202.9 | ₹31,061.31 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 78.33 | cum | 5,733.6 | ₹4,49,112.89 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 228 | sqm | 628.95 | ₹1,43,400.6 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, (with out ramming and watering) | 44.07 | cum | 180.55 | ₹7,956.84 |
| 7 | Supply of Stone boulders (Nallah nominal size 225 mm | 54.22 | cum | 700 | ₹37,954 |
| 8 | PVC pipes 75mm outer dia for wheepholes including carriage. | 12 | RM | 250 | ₹3,000 |
| 9 | Disposal of excavated earth avg. 01 km. | 109.37 | cum | 160.93 | ₹17,600.91 |
| 10 | Carriage of materials from source to road site of work by mechanical transport including loading, unloading and stacking. Stone / soling from Newa avg. 13 km | 54.22 | cum | 374.23 | ₹20,290.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1085306.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .