Loading…
Loading…
Tender Value
₹7.3 L
EMD Value
₹7,349
Closing Date
20 Jul 2026, 5:00 pm
Executive Officer,Kashinagar NAC
Executive Officer,Kashinagar NAC
Construction of Vending Zone at Tata Colony in place of MUKTA Vending Zone
2026_ORULB_134833_8
KNGR/NAC/01/2026-27
Open Tender
Civil Works - Buildings
90 days
Kashinagar NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Executive Officer, Kashinagar NAC
₹7,349
Yes
9 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation hard soil within 50m initial lead and 1.5m lift leveling the bed | 18.16 | Cum | 312.13 | ₹5,668.28 |
| 2 | Supplying Filling sand in foundation with well Watered & Rammed including cost ,conveyance and royality of sand and cost of labour T&P etc. complete | 9.83 | Cum | 544.47 | ₹5,352.14 |
| 3 | CC (1:3:6) using 40 mm size CBHG Metal including cost of all materials labour ,T & P watering curing etc . Complete | 3.51 | Cum | 5,960.6 | ₹20,921.71 |
| 4 | Brick Masonary with Flyash Brick of size 23x11x8 in CM (1:6) in foundtion & Plinth comp. Per cum | 26.61 | Cum | 5,429.83 | ₹1,44,487.78 |
| 5 | CC (1:4:8) using 40 mm size CBHG Metal including cost of all materials labour ,T & P watering curing etc . Complete | 2.92 | Cum | 5,569.28 | ₹16,262.3 |
| 6 | Reinforced Cement concrete M20 using 20mm down-graded HGCB chips etc cum | 15.3 | Cum | 6,450.43 | ₹98,691.58 |
| 7 | Supplying,cutting ,bending ,binding and tying iron rods & placing uncoted HYSD bar reinforcement In position etc.comp. per Qtl. | 15.3 | Qtl | 9,271.92 | ₹1,41,860.38 |
| 8 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp.(Column and Wall Beam) | 37.41 | Sqm | 1,247.94 | ₹46,685.44 |
| 9 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp.(Column and Grade Beam) | 17.33 | Sqm | 249.83 | ₹4,329.55 |
| 10 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp.(Lintel) | 6.23 | Sqm | 577.73 | ₹3,599.26 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_600350.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid