Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71,454.65Accepted-AOC AT BHALUGADIA P O KUMUNDA TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹71,454.65 Quoted ₹60,646.38 | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹62,214.52+₹1,568.14 (2.59%)Rejected-Finance AT PIDHAKHAMAN PO RAIJHARAN DIST ANGUL ODISHA PIN 759130 | ANGUL | ANGUL | ODISHA | 759130 | ₹62,214.52+₹1,568.14 (2.59%) | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹66,719.68+₹6,073.30 (10.0%)Rejected-Finance | ₹66,719.68+₹6,073.30 (10.0%) | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
Tender Value
₹1.0 L
EMD Value
₹1,300
Closing Date
9 May 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Emergency closing of the Man made through passages of outsiders to coal stock yard of the wind barrier brick masonry wall at Hingula OCP, Hingula Area.
2026_MCL_358883_1
MCL/GM(HA)/Civil/e-Tender/ 26-27/15 Dt.28.04.2026
Open Tender
Civil Works - Others
Percentage
30 days
HINGULA OCP
AS PER NIT
3 documents required · 3 mandatory
₹1,300
Yes
25 May 2026
29 Apr 2026
11 May 2026
29 Apr 2026
9 May 2026
29 Apr 2026
29 Apr 2026 - 2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.44 | cum | 6,667.75 | ₹69,611.31 |
| 1.02 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 45.36 | SQM | 226.25 | ₹10,262.7 |
| 1.03 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 45.36 | SQM | 130.2 | ₹5,905.87 |
| 2Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 2.46 MB
BOQ_371750.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .