Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 CrAccepted-AOC AT BHARTI TOWER BLOCK A BHUBANESWAR DIST KHURDHA | BHUBANESWAR | KHURDHA | ODISHA | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.4 Cr+₹38.2 L (2.73%)Rejected-AOC BHUBANESWAR | BHUBANESWAR | BHUBANESWAR | ODISHA | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.4 Cr+₹42.9 L (3.06%)Rejected-Finance PLOT NO 2150 2744 MANGALAPUR VIHAR SISUPALGARH BHUBANESWAR DIST KHURDA ODISHA PIN 751002 | BHUBANESWAR | KHURDA | ODISHA | 751002 | L3 | Rejected-Finance L3 | |
| 4 | L4₹14.5 Cr+₹47.3 L (3.38%)Rejected-Finance SECTOR 2 PLOT NO 340 NILADRI VIHAR BHUBANESWAR 751021 | BHUBANESWAR | KHURDA | ODISHA | 751021 | L4 | Rejected-Finance L4 |
Tender Value
₹16.5 Cr
EMD Value
₹16.5 L
Closing Date
26 Jun 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer (Buildings-II), Odisha, Bhubaneswar
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Balance Work for Construction of Regional Transport Office Bhubaneswar-II and Transport Department Multinodal Centre at Chandrasekharpur, Bhubaneswar.
2025_EICCL_114426_1
C.E. (B) - 08 / 2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
BHUBANESWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹16.5 L
Yes
20 Nov 2025
12 Jun 2025
30 Jun 2025
12 Jun 2025
26 Jun 2025
12 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK Earth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods maximum 5cm to 7cm & laying in layers not exceeding 0.3m depth for the work complete including shoring, shuttering & dewatering (if required) with cost of all Labour, Labour cess ,Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | |||||
| 1.01 | Basement | 29.15 | Cum | 241.5 | ₹7,039.72 |
| 2Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge. | |||||
| 2.01 | Ground Floor | 17.97 | Cum | 629.6 | ₹11,313.91 |
| 3Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | |||||
| 3.01 | Ground Floor | 5.33 | Cum | 6,187.1 | ₹32,977.24 |
| 4Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. | |||||
| 4.01 | Column base & Footing | - | - | - | - |
| 4.02 | Ground Floor | 4.03 | Cum | 6,977 | ₹28,117.31 |
| 4.03 | Column Superstucture | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 36.27 MB
BOQ.xls
BOQ • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .