Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
15 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RRWD SMC
Executive Engineer RRWD SMC REGAL LANE LAL CHOWK
Development of Graveyard at Taarbag Habbak Phase 1
2025_HAUDD_299202_1
NOTICE INVITING E TENDER No.43 of 2025-2026 RRWD SMC Dated 26 12 2025
Open Tender
Civil Works
Percentage
54 days
Taarbag Habbak Phase 1
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹802
F.A/C.A.O SMC 0216010200000007
₹50,000
26 Dec 2025
26 Dec 2025
16 Jan 2026
26 Dec 2025
15 Jan 2026
26 Dec 2025
Engagement of Labourers for Site Clearance
Dismantling of existing Chain Link Fencing, Steel Work complete, including stacking of Serviceable material and disposal of unserviceable material within a leas as directed.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :50 meter beyond 1m from cutting edge
Providing and laying Stone Soling including Compacting, Watering including all carriages of material complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Providing and laying chisel dressed Devri Stone of size 300x200 mm face with 150 mm depth in cement mortar 1: 6 (1 cement : 6 coarse sand) upto plinth level including curing. One face dressed Fine chisel dressed
Extra for fine chisel dressed Devri Stone in square or rectangular Pillars
Extra for additional cost of Providing Stone work in Arches inculding Scafolding, Centrering to Arche, including all strutting, bolting, wedging etc and removal (area of Soffit to be measured)
Providing and laying chisel dressed Devri Stone ornamental cornce of 75mm Thick with the width of 300mm-200 in cement mortar 1:6 (1 Cement: 6 Coarse Sand) upto Plinth Level including curing fine chisel dressed.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications: Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture
Providing laying and fixing 50 MM thick rubber moulded cement concrete interlock tile of required shape, size and colour ( weight of each tile 5.50 kg) laid over 50 mm (average) thick sand cushion/ levelling coarse , including filling joints with dry mix of 1:4 ( 1 cement :4 sand) including all leads lifts carriages (mechanical /manual) Complete job.
Provision for making of inaugration/foundation stone in machine moulded bricks in 1:4 Cement Mortar Mix and fixing of granite stone sign board in the same all complete including all carriages complete.
Supplying, Stacking, Laying and Spreading of good earth in layers free from all foreign material consolidating each deposited layer by ramming and watering with all carriages and from source to site including royalty (Earth Measured in stacks will be reduced by 20/% for payment).
Engagement of Excavator (JCB) for leveling of ground in all terrains including Fuel Charges complete.
Carriage of materail by mechanical means A. Sand
B. Aggregates
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.22 MB
BOQ_970576.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .