| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC | 1 | Accepted-AOC L-1 BIDDER | |
| 2 | 2₹16.3 L+₹1.0 L (6.66%)Rejected-AOC | 2 | Rejected-AOC L-2 BIDDER | |
| 3 | 3₹17.1 L+₹1.9 L (12.3%)Rejected-AOC | 3 | Rejected-AOC L-3 BIDDER |
| Sl No | Description | Qty | Unit | M/S SCIENTECS PROCESS CONTROL L1 | Deen Dayal L2 | SSB ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Arresting oil leakage from radiators and associated pipe lines of the transformers. | 18 | Per Pt. | 500 ₹9,000 Lowest | 500 ₹9,000 Lowest | 580 ₹10,440 |
| 2.00 | Replacement of HT/LT, Neutral Bushing/ gaskets of LT Transformers (Up to 1.6 MVA) | 4 | Per Ph. | 800 ₹3,200 | 780 ₹3,120 Lowest | 920 ₹3,680 |
| 3.00 | Replacement of HT/LT side turret gasket of LT Transformer for arresting oil leakage. | 12 | Per Job. | 1,300 ₹15,600 Lowest | 1,500 ₹18,000 | 2,000 ₹24,000 |
| 4.00 | Arresting oil leakage from top/bottom inspection cover of the transformer or back inspection cover of bushing by even tightening of nuts & bolts and applying M-seal etc. there after. | 12 | Per Job. | 1,100 ₹13,200 Lowest | 1,200 ₹14,400 | 1,500 ₹18,000 |
| 5.00 | Centrifuging of transformer oil of HT/ LT transformer/ Storage tank. | 26 | Per day | 4,800 ₹1,24,800 Lowest | 5,000 ₹1,30,000 | 4,800 ₹1,24,800 Lowest |
| 6.00 | Overhauling of marshalling boxes for transformers:-From 1.0 MVA upto 1.6 MVA. | 4 | Per Job. | 1,250 ₹5,000 | 1,200 ₹4,800 Lowest | 1,500 ₹6,000 |
| 7.00 | Thorough cleaning of transformers after completion of work during overhauling/ breakdown:-From 1.0 MVA upto 1.6 MVA. | 4 | Per Job. | 1,250 ₹5,000 | 1,500 ₹6,000 | 1,245 ₹4,980 Lowest |
| 8.00 | Complete overhauling of 1.5MVA or 1.6MVA, 6.9/0.4 KV LT Transformers of 3x210 MW, ‘A’TPS, Anpara, Sonebhadra, as per scope of work. | 10 | No. | 56,500 ₹5,65,000 Lowest | 60,000 ₹6,00,000 | 62,000 ₹6,20,000 |
| 9.00 | Complete overhauling of 1.0 MVA, 6.9/0.4 KV LT Transformers of 3x210 MW, ‘A’TPS, Anpara, Sonebhadra, as per scope of work. | 10 | No. | 54,500 ₹5,45,000 Lowest | 58,000 ₹5,80,000 | 60,000 ₹6,00,000 |
| 10.00 | Erection & commissioning of LT Transformer (1.0 MVA /1.6MVA, 6.6KV/0.4KV) in place of damaged one. | 10 | Per Job. | 23,800 ₹2,38,000 Lowest | 26,000 ₹2,60,000 | 30,000 ₹3,00,000 |
Tender Value
Refer Docs
EMD Value
₹30,700
Closing Date
20 Oct 2025, 11:00 amClosed
SE OMC-IV ATPS
OFFICE OF SE OMC-IV ATPS
Overhauling/Breakdown maintenance of LT transformer (service transformer) including gasket replacement and oil filtration.
2025_RVUNL_1078310_1
06/OMC-IV/EMD-I/ ATPS/2025-2027
Open Tender
Electrical Works
Lump-sum
720 days
ATPS ANPARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Dy CAO CFA AND BO ATPS ANPARA
₹30,700
23 Jan 2026
29 Sept 2025
22 Oct 2025
29 Sept 2025
20 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 2.19 MB
BOQ_1971087.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .