Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC | ₹14.9 L Quoted ₹15.2 L | 1 | Accepted-AOC L-1 BIDDER |
| 2 | 2₹16.3 LRejected-AOC | ₹16.3 L | 2 | Rejected-AOC L-2 BIDDER |
| 3 | 3₹17.1 LRejected-AOC | ₹17.1 L | 3 | Rejected-AOC L-3 BIDDER |
| Sl No | Description | Qty | Unit | M/S SCIENTECS PROCESS CONTROL L1 | Deen Dayal L2 | SSB ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Arresting oil leakage from radiators and associated pipe lines of the transformers. | 18 | Per Pt. | 500 ₹9,000 | 500 ₹9,000 | 580 ₹10,440 |
| 2.00 | Replacement of HT/LT, Neutral Bushing/ gaskets of LT Transformers (Up to 1.6 MVA) | 4 | Per Ph. | 800 ₹3,200 | 780 ₹3,120 | 920 ₹3,680 |
| 3.00 | Replacement of HT/LT side turret gasket of LT Transformer for arresting oil leakage. | 12 | Per Job. | 1,300 ₹15,600 | 1,500 ₹18,000 | 2,000 ₹24,000 |
| 4.00 | Arresting oil leakage from top/bottom inspection cover of the transformer or back inspection cover of bushing by even tightening of nuts & bolts and applying M-seal etc. there after. | 12 | Per Job. | 1,100 ₹13,200 | 1,200 ₹14,400 | 1,500 ₹18,000 |
| 5.00 | Centrifuging of transformer oil of HT/ LT transformer/ Storage tank. | 26 | Per day | 4,800 ₹1.2 L | 5,000 ₹1.3 L | 4,800 ₹1.2 L |
| 6.00 | Overhauling of marshalling boxes for transformers:-From 1.0 MVA upto 1.6 MVA. | 4 | Per Job. | 1,250 ₹5,000 | 1,200 ₹4,800 | 1,500 ₹6,000 |
| 7.00 | Thorough cleaning of transformers after completion of work during overhauling/ breakdown:-From 1.0 MVA upto 1.6 MVA. | 4 | Per Job. | 1,250 ₹5,000 | 1,500 ₹6,000 | 1,245 ₹4,980 |
| 8.00 | Complete overhauling of 1.5MVA or 1.6MVA, 6.9/0.4 KV LT Transformers of 3x210 MW, ‘A’TPS, Anpara, Sonebhadra, as per scope of work. | 10 | No. | 56,500 ₹5.7 L | 60,000 ₹6 L | 62,000 ₹6.2 L |
| 9.00 | Complete overhauling of 1.0 MVA, 6.9/0.4 KV LT Transformers of 3x210 MW, ‘A’TPS, Anpara, Sonebhadra, as per scope of work. | 10 | No. | 54,500 ₹5.5 L | 58,000 ₹5.8 L | 60,000 ₹6 L |
| 10.00 | Erection & commissioning of LT Transformer (1.0 MVA /1.6MVA, 6.6KV/0.4KV) in place of damaged one. | 10 | Per Job. | 23,800 ₹2.4 L | 26,000 ₹2.6 L | 30,000 ₹3 L |
Tender Value
Refer Docs
EMD Value
₹30,700
Closing Date
20 Oct 2025, 11:00 amClosed
SE OMC-IV ATPS
OFFICE OF SE OMC-IV ATPS
Overhauling/Breakdown maintenance of LT transformer (service transformer) including gasket replacement and oil filtration.
2025_RVUNL_1078310_1
06/OMC-IV/EMD-I/ ATPS/2025-2027
Open Tender
Electrical Works
720 days
ATPS ANPARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Dy CAO CFA AND BO ATPS ANPARA
₹30,700
23 Jan 2026
29 Sept 2025
22 Oct 2025
29 Sept 2025
20 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 2.19 MB
BOQ_1971087.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid