| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 209 URBAN ESTATE KURUKSHETRA KURUKSHETRA HARYANA 136118 | KURUKSHETRA | HARYANA | 136118 | L1 | Admitted-Finance | |
| 2 | L2₹1.6 Cr+₹12.1 L (8.05%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical due to shortfall of requisite documents |
| Sl No | Description | Qty | Unit | INVENTIS TECHNOSYS PRIVATE LIMITED L1 | Advent Technologies L2 |
|---|---|---|---|---|---|
| 1.01 | Clearing of site by employing labour, tool and tackle, men and machinery for start of work. The job includes labour cost, hire charges of tools and tackles, machinery and taxes as applicable | 1 | Job | 10,000 ₹10,000 Lowest | 10,700 ₹10,700 |
| 2.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Foundation for plinth work
Foundation for columns
Paver
Stairs
Total = 44.05 m3 | 44.05 | cum | 632 ₹27,839.6 Lowest | 700 ₹30,835 |
| 3.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Foundation for plinth work
Foundation for columns
Paver
Stairs
Volume Flooring
Total = 44.44 m3 | 44.44 | cum | 4,642.35 ₹2,06,306.03 Lowest | 5,000 ₹2,22,200 |
| 4.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:2:4 (one cement: Two coarse sand: Four Graded stone aggregate 20 mm nominal in size)
Foundation for plinth work
Foundation for columns
Paver
Stairs
Volume Flooring
Total = 76.01 m3 | 76.01 | cum | 6,320.5 ₹4,80,421.21 Lowest | 8,000 ₹6,08,080 |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Plinth above NSL
Total=94.80 m2 | 94.8 | sqm | 273.4 ₹25,918.32 Lowest | 292.54 ₹27,732.6 |
| 6.01 | Providing and laying river bed material / good earth including loading unloading and watering after every layer of 30 cm. The rolling is to be done by hand rammer. The rate includes supply and carriages and all forms of taxes.
Volume Flooring Total = 132.67 m3 | 132.67 | cum | 482 ₹63,946.94 Lowest | 515.74 ₹68,423.23 |
| 7.01 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick 20 mm size stone aggregate.
Area Flooring
Total = 327.18 m2 | 327.18 | sqm | 580.7 ₹1,89,993.43 Lowest | 621.35 ₹2,03,292.97 |
| 8.01 | DSteel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Columns
a. 10 mm rebars for column mesh
Flooring(300 mm c/c)
a. 10 mm rebars
Tie beam
a. 10 mm rebars
b. 8 mm stirrups ( 300 mm c/c)
Total = 1839.34 kgs | 1,839.34 | kgs | 112.32 ₹2,06,594.67 Lowest | 120.18 ₹2,21,055.56 |
| 9.01 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
A. SHED
Columns(80 x 80 x 4 mm)
M.S. Plates
300x300x6 mm
300x300x10 mm
M.S. Anchor Bolts with nuts(20 mm x 750 mm)
Truss/Rafters/purlins
Outer members of truss including king post (80x40x4 mm)
Inner members of truss (60x40x3 mm)
Purlins(60x40x2.5 mm)
Side rails (50x25x2.5 mm)
Columns(60 x 40 x 3 mm)
Total Weight = 5471.98 kgs | 5,471.98 | kgs | 126.5 ₹6,92,205.47 Lowest | 135.36 ₹7,40,659.85 |
| 10.01 | Providing and fitting of 0.50 mm pre profiled colour coated corrugated sheets to be laid over a frame work of trusses columns and purlins using hot dipped Zinc Coated self-drilling screws, Hexagonal Washers, Fasteners etc.
Total = 417.16 m2 | 417.16 | sqm | 826.43 ₹3,44,753.54 Lowest | 884.28 ₹3,68,886.25 |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
27 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Machinery Division jammu
Executive Engineer, Machinery Division jammu
Establishment of 20 MT Capacity Spawn Production Laboratory under HADP Project Promotion of Mushroom Cultivation at Gole Pully Talab Tillo Jammu
2026_PWDJK_328725_1
MDJ/Tech/e-NIT/2026-27/69
Open Tender
Machineries/ Mechanical Engg Items
Turn-key
120 days
Talab Tillo Jammu
AS PER E NIT
2 documents required · 2 mandatory
₹3,000
Executive Engineer, Machinery Division jammu
₹3 L
2 Nov 2026
19 Oct 2026
28 Oct 2026
19 Oct 2026
27 Oct 2026
22 Oct 2026
19 Oct 2026 - 27 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Clearing of site by employing labour, tool and tackle, men and machinery for start of work. The job includes labour cost, hire charges of tools and tackles, machinery and taxes as applicable | 1 | Job | 100 | ₹100 |
| 2.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Foundation for plinth work
Foundation for columns
Paver
Stairs
Total = 44.05 m3 | 44.05 | cum | 101 | ₹4,449.05 |
| 3.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Foundation for plinth work
Foundation for columns
Paver
Stairs
Volume Flooring
Total = 44.44 m3 | 44.44 | cum | 102 | ₹4,532.88 |
| 4.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:2:4 (one cement: Two coarse sand: Four Graded stone aggregate 20 mm nominal in size)
Foundation for plinth work
Foundation for columns
Paver
Stairs
Volume Flooring
Total = 76.01 m3 | 76.01 | cum | 102 | ₹7,753.02 |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Plinth above NSL
Total=94.80 m2 | 94.8 | sqm | 102 | ₹9,669.6 |
| 6.01 | Providing and laying river bed material / good earth including loading unloading and watering after every layer of 30 cm. The rolling is to be done by hand rammer. The rate includes supply and carriages and all forms of taxes.
Volume Flooring Total = 132.67 m3 | 132.67 | cum | 102 | ₹13,532.34 |
| 7.01 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick 20 mm size stone aggregate.
Area Flooring
Total = 327.18 m2 | 327.18 | sqm | 102 | ₹33,372.36 |
| 8.01 | DSteel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Columns
a. 10 mm rebars for column mesh
Flooring(300 mm c/c)
a. 10 mm rebars
Tie beam
a. 10 mm rebars
b. 8 mm stirrups ( 300 mm c/c)
Total = 1839.34 kgs | 1,839.34 | kgs | 102 | ₹1,87,612.68 |
| 9.01 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
A. SHED
Columns(80 x 80 x 4 mm)
M.S. Plates
300x300x6 mm
300x300x10 mm
M.S. Anchor Bolts with nuts(20 mm x 750 mm)
Truss/Rafters/purlins
Outer members of truss including king post (80x40x4 mm)
Inner members of truss (60x40x3 mm)
Purlins(60x40x2.5 mm)
Side rails (50x25x2.5 mm)
Columns(60 x 40 x 3 mm)
Total Weight = 5471.98 kgs | 5,471.98 | kgs | 102 | ₹5,58,141.96 |
| 10.01 | Providing and fitting of 0.50 mm pre profiled colour coated corrugated sheets to be laid over a frame work of trusses columns and purlins using hot dipped Zinc Coated self-drilling screws, Hexagonal Washers, Fasteners etc.
Total = 417.16 m2 | 417.16 | sqm | 102 | ₹42,550.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1113320.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .