| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.7 LAccepted-AOC 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹10.7 L Quoted ₹9.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹9.5 LRejected-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | SALEM | TAMIL NADU | 636456 | ₹9.5 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BHARATH ENGINEERING WORKS L1 | LENIN ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting the existing eroded straight coal pipe of length 10mtr after arresting both ends of the rest of the pipe at elevation 16 mtr by loading with chain block or hoist all along the pipe to be rotated and arresting the movement of the pipe to be rotated horizontally | 16 | Nos | 16,620 ₹2.7 L | 17,100 ₹2.7 L |
| 2.00 | Rotating the cut straight coal pipe to 180º ( Bottom portion has to be brought to top portion vice versa ) from its original position by using hoist / winge ( Grane could not be utilized at this location. Since coal pipe are to be rotated are in mill area under the 18 mtr floor) to align the rest of the coal pipe ends without deviating the original position (ie) straightens. | 16 | Nos | 8,310 ₹1.3 L | 8,600 ₹1.4 L |
| 3.00 | Welding the rotated coal pipe after lifting to ( 16 mtr elevation ) original elevation to suit the rest of the pipe ends and removing the temporary supports and providing the supports already provided. | 16 | Nos | 10,730 ₹1.7 L | 11,200 ₹1.8 L |
| 4.00 | Charges for removing the existing damaged hanger supports assembly arrangements in the coal pipes. | 40 | Assy | 1,985 ₹79,400 | 2,150 ₹86,000 |
| 5.00 | Rectification of hanger support rod fixture eye, strengthening the pin and its nuts for assembly. | 40 | Assy | 1,985 ₹79,400 | 2,180 ₹87,200 |
| 6.00 | Charges for re fixing the hanger supports arrangements in its original position of the coal pipes without changing its elevation for assembly. | 40 | Assy | 1,985 ₹79,400 | 2,150 ₹86,000 |
| 7.00 | Cutting gas | 6 | Sets | 3,635 ₹21,810 | 4,000 ₹24,000 |
| 8.00 | Cost of MS Welding electrodes | 170 | Kgs | 437 ₹74,290 | 450 ₹76,500 |
| 9.00 | Charges for consumables and T& Ps | 1 | LS | 3,490 ₹3,490 | 3,500 ₹3,500 |
Tender Value
Refer Docs
EMD Value
₹9,800
Closing Date
18 Nov 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit II Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 2A 2B 2D 2E 2F to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
2024_EB_500423_1
CE / MTPS-I / SE / M-I / MP /OT.250/ 2024-25
Open Tender
Power/Energy Projects/Products
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹9,800
Yes
21 May 2026
12 Nov 2024
19 Nov 2024
12 Nov 2024
18 Nov 2024
12 Nov 2024
Amount
Cutting the existing eroded straight coal pipe of length 10mtr after arresting both ends of the rest of the pipe at elevation 16 mtr by loading with chain block or hoist all along the pipe to be rotated and arresting the movement of the pipe to be rotated horizontally
Rotating the cut straight coal pipe to 180º ( Bottom portion has to be brought to top portion vice versa ) from its original position by using hoist / winge ( Grane could not be utilized at this location. Since coal pipe are to be rotated are in mill area under the 18 mtr floor) to align the rest of the coal pipe ends without deviating the original position (ie) straightens.
Welding the rotated coal pipe after lifting to ( 16 mtr elevation ) original elevation to suit the rest of the pipe ends and removing the temporary supports and providing the supports already provided.
Charges for removing the existing damaged hanger supports assembly arrangements in the coal pipes.
Rectification of hanger support rod fixture eye, strengthening the pin and its nuts for assembly.
Charges for re fixing the hanger supports arrangements in its original position of the coal pipes without changing its elevation for assembly.
Cutting gas
Cost of MS Welding electrodes
Charges for consumables and T& Ps
LENIN ENGINEERING WORKS (BID ID -1187258)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_594987.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid