Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC AT PATEL NAGAR PO PHUSRO BAZA DIST BOKARO | PHUSRO BAZA | BOKARO | L1 | Accepted-AOC TECHNO COMMERCIALLY QUALIFIED | |
| 2 | Rejected-Technical | - | Rejected-Technical Documents not verified | |
| 3 | Rejected-Technical AT DHORI G M COLONY DIST BOKARO JHARKHAND | BOKARO | BOKARO | JHARKHAND | - | Rejected-Technical Documents not verified |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
24 Jun 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AKHIL UJJWAL,PE(EnM),SDOCM
OFFICE OF THE PROJECT OFFICER,SDOCM,DHORI AREA,CCL
Repair/ maintenance of 220 V road lighting line for Bhagat Singh Chowk to Turio colony and Extension/ re-organization of 440 V OH line at Excavation main gate in r/o SDOCM
2024_CCL_310312_4
SDOCM/PE(EnM)/NIT/24-25/02 DT.12.06.2024
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
SDOCM
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,300
16 Jul 2024
12 Jun 2024
25 Jun 2024
13 Jun 2024
24 Jun 2024
13 Jun 2024
13 Jun 2024 - 24 Jun 2024
Amount
Repair & maintenance of 220 V OH road lighting from Bhagat Singh chowk to Turio colony in r/o SDOCM.(not filling the rate)
Supply and providing of 200 Kg 9 mtr. Long solid rectangular PCC pole.
Erection of RCC/PCC pole of following length brick ballast and ramming the foundation, finshing with 150 mm thick cement concrete (1:3:6) layer and top with including excavation and refilling etc as required. (200 kg. 9mtr)
Erection of ACSR conductor of 7/2.11 mm to 7/3.00 diameter including binding etc. as required.06 span x 2 wire x 40 Mtr = 480 mtrs.x 0.214 = 102.72 kg.
Supplying of channel iron 75 mm x 40 mm x 6 mm (7.14 kg per mtr) cross arm for 4 wire O/H line complete with clamps, bolts nuts and washer etc including drilling of holes for insulator pins, etc (as per drawing) and painting with primer and finished paints as required.(For cradling)
Supplying of channel iron 75 mm x 40 mm x 6 mm ( 7.14 kg per mtr) cross arm for 2 wire O/H line complete with clamps, bolts nuts and washer etc including drilling of holes for insulator pins, etc (as per drawing ) and painting with primer and finish paints as required
Erection of angle iron/ channel iron cross arm on wood/ RCC/ PCC/ steel tubular/ rail pole etc. as required.
S/E of stay set complete (Galvanized) with 19/20 mm dia x 1.8 m long stay rod, anchor plate of size 45cm x 45 cm x 7.5 mm thimble stay clamp, turn buckle (20mm x 60 cm) 7/4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc as required.
Supply and erection of glavanised ‘D’ iron clamps complete with shackle insulator (100 mm x 110 mm) G.I. bolts nuts and washers, coach screw etc. as required. (For proper cradling)
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required .
Supply of 6 SGW GI wire. 4 span x 3x 40 Mtr = 480 Mtr + 30%(624)= 624 x 0.192 = 119.80 Kg
Erection of cradle guard as required. 4spanx 32 = 128 nos
Cleaning jungle including of uprooting vegetation grass bush wood tree & sapling of girth up to 30 cm measured at a height of 1 mts. Above ground level removal of rubbish up to a distance of 50 mts. Outside periphery of the area cleared.( Total length approx 200 Mtr x 2 m wide) = 400 Sqm
Dismantling of pole/street light standard/ strut embedded in cement concrete foundation etc. as required.
Dismantling of O/H line comprising of copper/ aluminium O/H conductor, G.I. wire, cross arm, insulator etc. as required. 06 span x 2 wire x 40 Mtr = 480 mtrs.x 0.214 = 102.72 kg..Iron material – 4 set cross arm x 2 m x 7.14 kg/m = 57.12 Kg, Pin insulator = 08 x 0.5 kg = 4 Kg, Shackle Insulator = 6 nos x 0.5 Kg = 3 Kg, Total weight = 102.72 + 57.12 + 4 + 3 = 166.84 Kg
Supply and fixing of 32 mm dia x 2.00 mtr long G.I. pipe (medium class) br5acket for mounting of fluorescent / HPMV/ HPSV street light fitting on top of pole including bending the pipe to the required shape, 2nos 40 mm x 3 mm flat iron clamp with nuts, bolts, washer, painting the flat iron with primer and finish paint etc. as required
Transporting of 200 Kg 9 mtr. Long solid rectangular PCC pole from Factory to working site.
Extension/ Re-organisation of 440V OH line at Excavation main gate in r/o SDOCM.(Not filling the rate)
Erection of steel tubular or rail pole strut in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling and secured with holding clamps, bolts, nuts, etc. as required.
Erection ACSR conductor of 7/3.35 mm dia meter to 7/3.35 mm dia meter including binding etc. as required. 03 Span x 4 wire x 40 Mtr = 480 mtr x 0.214 = 102.72 Kg
Supplying of channel iron 75 mm x 40 mm x 6 mm (7.14 kg per mtr) cross arm for 4 wire O/H line complete with clamps, bolts nuts and washer etc including drilling of holes for insulator pins, etc (as per drawing) and painting with primer and finished paints as required.
Supplying of channel iron 75 mm x 40 mm x 6 mm ( 7.14 kg per mtr) cross arm for 2 wire O/H line complete with clamps, bolts nuts and washer etc including drilling of holes for insulator pins, etc (as per drawing ) and painting with primer and finish paints as required
Erection of angle iron/ channel iron cross arm on wood/RCC/PCC steel tubular/ rail pole etc. as required.
S/E of stay set complete (Galvanized) with 19/20 mm dia x 1.8 m long stay rod, anchor plate of size 45cm x 45 cm x 7.5 mm thimble stay clamp, turn buckle (20mm x 60 cm) 7/4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc as required.
Supply and erection of glavanised ‘D’ iron clamps complete with shackle insulator (100 mm x 110 mm) G.I. bolts nuts and washers, coach screw etc. as required.
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required .
Supply of 6 SGW GI wire. 3 span x 3wire x 40mtr = 360 mtr + 30% (468 mtr)= 468 mtrs x 0.192 = 89.86 Kg
Erection of cradle guard as required. 03 spanx 32 = 96 nos
Dismantling of pole/street light standard/ strut embedded in cement concrete foundation etc. as required.
Dismantling of 440 V OH line comprising of copper/ aluminium O/H conductor, G.I. wire, cross arm, insulator etc. as required. 03 Span x 4 wire x 40 Mtr = 480 mtr x 0.214 = 102.72 Kg Iron material – 2 set cross arm x 2 m x 7.14 kg/m = 28.56 Kg, Pin insulator = 4 x 0.5 kg = 2 Kg, Shackle Insulator = 6 nos x 0.5 Kg = 3 Kg, Total weight = 102.72 + 28.56 + 4 + 3 = 138.28 Kg
Handling of tubular pole of Height 11 Mtr upto working site (Truck departmentally provided).
Total impact of GST for the purpose of CTC
M/S R.N. ELECTRICAL WORKS
M/S ANUPAMA ELECTRICAL WORKS
techsummary_321543.pdf
PDF • 0.51 MB
finsummary_321543.pdf
PDF • 0.51 MB
310312_4WO.pdf
PDF • 0.42 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .