| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | ₹10.0 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹10.0 LRejected-Finance | ₹10.0 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹11.1 LRejected-Finance NO 134 BETHANAYAKKANPETTAI UTHUKOTTAI TALUK ATHIVAKKAM TIRUVALLUR 601102 | ATHIVAKKAM | TIRUVALLUR | TAMIL NADU | 601102 | ₹11.1 L | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹11.1 LRejected-Finance | ₹11.1 L | L4 | Rejected-Finance L4 BIDDER |
| Sl No | Description | Qty | Unit | Babu D L3 | SAGO SHAM & CO L2 | SMV TRADERS L1 | S ARUMUGAM L4 |
|---|---|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF 30000LTR SUMP IN GOUNDERPALAYAM @ KONDAKARAI PANCHAYAT IN MINJUR PANCHAYAT UNION @ TIRUVALLUR DISTRICT UNDER PERI URBAN 6TH SFC (OMDGF) /2025 - 2026/ RD/TVLR/MJR09 | |||||||
| 2.00 | Earthwork excavation in hard soil with intral lead and lift asper SS 20B for foundation | 74.53 | CUM | 263.78 ₹19,659.52 | 263.78 ₹19,659.52 | 263.78 ₹19,659.52 | 263.78 ₹19,659.52 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.98 | CUM | 2,279.44 ₹6,792.73 | 2,279.44 ₹6,792.73 | 2,279.44 ₹6,792.73 | 2,279.44 ₹6,792.73 |
| 4.00 | CC 1:4:8 mix using 40 mm HBH metal incluiding cost and conveyance of all materals and all labour charges etc. completed. | 2.98 | CUM | 6,080 ₹18,118.40 | 3,000 ₹8,940 | 5,000 ₹14,900 | 10,000 ₹29,800 |
| 5.00 | Supply and Fabrication of Steel including cost and conveyance all materials to site and labour charges etc. completed. | 2.65 | MT | 91,885 ₹2.4 L | 70,000 ₹1.9 L | 60,000 ₹1.6 L | 90,000 ₹2.4 L |
| 6.00 | Towards Centering Chargers for all RCC items rate including cost and conveyance of all materials to site and labour charges etc. completed.( Curved Surface ) | 152.05 | SQ.M | 1,642.5 ₹2.5 L | 1,642.5 ₹2.5 L | 1,642.5 ₹2.5 L | 1,642.5 ₹2.5 L |
| 7.00 | RCC1:1/2:3 mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges etc. complete. | 23.68 | CUM | 9,811.56 ₹2.3 L | 9,000 ₹2.1 L | 9,811.56 ₹2.3 L | 9,811.56 ₹2.3 L |
| 8.00 | Plastering in CM 1:3 mix using 10mm thickness including cost and conveyance of all materials to site and labour charges etc. complete. | 144.2 | SQ.M | 330.44 ₹47,649.45 | 330.44 ₹47,649.45 | 330.44 ₹47,649.45 | 330.44 ₹47,649.45 |
| 9.00 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete | 43.84 | SQ.M | 262.48 ₹11,507.12 | 262.48 ₹11,507.12 | 262.48 ₹11,507.12 | 262.48 ₹11,507.12 |
| 10.00 | Mottor for the Submersible pumpset etc.,75x100 | 1 | NOS | 55,754 ₹55,754 | 55,754 ₹55,754 | 55,754 ₹55,754 | 55,754 ₹55,754 |
Tender Value
₹11.2 L
EMD Value
₹12,000
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO (VP) MINJUR BLOCK
MINJIUR BLOCK OFFICE
CONSTRUCTION OF 30000LTR SUMP IN GOUNDERPALAYAM AT KONDAKARAI PANCHAYAT IN MINJUR
2026_RDTN_662156_9
2039/2023/A7
Open Tender
Civil Works
180 days
MINJUR
CLASS V AND ABOVE
4 documents required · 4 mandatory
₹0
₹12,000
Yes
26 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
1. CONSTRUCTION OF 30000LTR SUMP IN GOUNDERPALAYAM @ KONDAKARAI PANCHAYAT IN MINJUR PANCHAYAT UNION @ TIRUVALLUR DISTRICT UNDER PERI URBAN 6TH SFC (OMDGF) /2025 - 2026/ RD/TVLR/MJR09
Earthwork excavation in hard soil with intral lead and lift asper SS 20B for foundation
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
CC 1:4:8 mix using 40 mm HBH metal incluiding cost and conveyance of all materals and all labour charges etc. completed.
Supply and Fabrication of Steel including cost and conveyance all materials to site and labour charges etc. completed.
Towards Centering Chargers for all RCC items rate including cost and conveyance of all materials to site and labour charges etc. completed.( Curved Surface )
RCC1:1/2:3 mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges etc. complete.
Plastering in CM 1:3 mix using 10mm thickness including cost and conveyance of all materials to site and labour charges etc. complete.
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Mottor for the Submersible pumpset etc.,75x100
ERECTION OF POWER PUMPSET IN BORE/ OPENWELL
Suitable panel board for the 3Phase Submessible Pumbset etc,..completed.
65mm Ø GI pipes
65mm Ø GM Gate valve
65mm Ø GI Elbow
65mm Ø GI union
Supply and delivery of 4 sq.mm
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_794940.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.41 MB
TenderDocumentMJR09.pdf
Tender Documents • 0.35 MB
BOQ_794940.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid