Loading…
Loading…
Tender Value
₹5.8 Cr
EMD Value
₹11.6 L
Closing Date
27 Jul 2026, 3:00 pm
SE AGRA
Office Complex, Sector-13, Sikandra Yojna Agra
Construction of Non Residential Thana Building At Kiraoli, Agra
2026_UPHDB_1165466_1
1893/UPHDB/DW-24/187 Date 23.06.2026
Open Tender
Civil Works
300 days
Agra
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Executive Engineer, CDAGRA-02, UPAVP
₹11.6 L
Yes
1 Jul 2026
1 Jul 2026
28 Jul 2026
1 Jul 2026
27 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of Jungle & removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 807.33 | SQM | 13.42 | ₹10,834.37 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 996.46 | CUM | 198.47 | ₹1,97,767.42 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 116.69 | CUM | 1,619.31 | ₹1,88,957.28 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | 115.91 | CUM | 5,193.99 | ₹6,02,035.38 |
| 5 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 807.33 | SQM | 236.41 | ₹1,90,860.89 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the
following grades of concrete.
Concrete of M25 grade with minimm cement content of 330 kg /cum (UPTO PLINTH) | 244.69 | CUM | 7,247.15 | ₹17,73,305.13 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the
following grades of concrete.
Concrete of M25 grade with minimm cement content of 330 kg /cum (ABOVE PLINTH) | 811.97 | CUM | 7,518.32 | ₹61,04,650.29 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the
following grades of concrete.All works above plinth level upto floor V level Concrete of M30 grade with minimum cement content of 330 kg /cum Water tank | 24.73 | CUM | 7,633.42 | ₹1,88,774.48 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 15 in .foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 83 | CUM | 6,229.1 | ₹5,17,015.3 |
| 10 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (Zone III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources). | 73.05 | SQM | 313.26 | ₹22,883.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.98 MB
finbid.pdf
Tender Documents • 23.02 MB
techbid.pdf
Tender Documents • 23.02 MB
BOQ_2185858.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid