| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹4.8 L+₹4,842.56 (1.01%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹4.8 L+₹5,369.97 (1.12%)Rejected-Finance VILL SERPUR ETOWARIBAR P O P S CONTAI DIST PURBA MEDINIPUR PIN 721401 | CONTAI | PURBA MEDINIPUR | WEST BENGAL | 721401 | 3 | Rejected-Finance L3 |
Tender Value
₹4.8 L
EMD Value
₹9,589
Closing Date
9 Dec 2025, 5:00 pmClosed
Chairman, Contai Municipality
Hatabari, Contai
Construction of Corrogated Tin Shed at Serpur Sitala Mandir under Booth no 116, Priority no 2, Ward No VIII within Contai Municipality under APAS Scheme
2025_MAD_949240_2
WBMAD/ULB/CONTAI/190/APAS/B 116/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Contai Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,589
1 Apr 2026
15 Nov 2025
11 Dec 2025
15 Nov 2025
9 Dec 2025
15 Nov 2025
Page No.- 1, Item No.- 2(a).
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Page No.- 1, Item No.- 3(a).
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.
Page No.- 2, Item No.- 4(A).
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) PWD Building Works schedule,
Page No.- 47, Item No.- 3
Supplying and laying polythine sheet ( 150 gm/sq.m ) over dampproof course or beloe flooring or roof terracing or foundation or foundation trenches.
Page No.- 23, Item No.- 1(a)( rate analysis)
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion.
Page No.- 15, Item No.- 7(a) (rate analysis)
Brick work with 1st class bricks in cement mortar (1:4) (a) Foundation and plinth groung floor
P.W.D, Page No.- 26, Item no.- 10(i)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
P.W.D, Page No.- 43, Item no.- 40 (i)(I).
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m. (i)Tor steel JSW/JSPL/SHYAM/SRMB/BMASL/ELETROSTEEL/ SSL
Page No.- 42, Item No.- 36(c)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (c) 9 mm to 12 mm thick approved quality Ply board shuttering as per decision & direction of Engineer-In-Charge.
Page No.- 48, Item No.- 6(ii) (rate analysis)
Artificial stone in floor ,dado,staircaseetc with cement morter (1:2:4)with stone chips lsied in panels as directed with topping made with ordinary or white cement (as necessary) and marbel dust in proportion (1:2) in cluding smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/ sq.m all complete including all materials and labour. In ground floor 3 mm thick topping using gray cement (ii)25 mm
Page No.- 189, Item No.-1(i)© (rate analysis)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15 mm thick plaster
Page No.- 192, Item No.-15 (rate analysis)
Neat cement punning about 1.5 mm thick in wall ,dado, window sills, floors etc .
Page No.- 101, Item No.-2A
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. i) For roof truss works a) Span up to 12 Mtr
Page No.-82, Item no.- 14.
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:- a) With 0.5 mm thick sheet
Page No.-82, Item no.- 11(b).
Galvanised iron sheet eaves gutter fitted and fixed with necessary 50 mm X 6 mm M.S flat bar clamps bent to design,bolts, nuts, washers etc. complete. Eaves gutter made of 0.63 mm. sheets.(300mm End lapping) (b) 300 mm. wide gutter
Page No.- 200, Item no.- 1(a).
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Page No.- 200, Item no.- 2(A)(b)(ii).
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. On steel or other metal surface. Two coats ( with any shade exept white)
P.W.D (Roads)Page No.- 270/ Item No. - 8.07
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
Add GST @ 18% ( Sl. No.- 1 to 18)
Add Labour welfare Cess @1% (Sl.No.-1 To 19)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_2263063.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .