Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹85 L
EMD Value
₹6.3 L
Closing Date
18 Feb 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
W/S of Pachahatiya to suraj ghat
2026_CEUVZ_1114138_4
15camp/SE Tender/jnp-gzp circle/25 Date-14-01-2026
Open Tender
Civil Works
Percentage
180 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.3 L
Yes
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
9 Apr 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
10 Feb 2026
Scarifying the existing bituminous surface to a depth of 20 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Cartage Up to 2 Km) All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and laying dense graded bituminous macadam Grade-2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and applying tack coat-2 with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and laying bituminous macadam Grade-2 with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from borow pit with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Lead upto 2.00 Km.) (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Plain Cement Concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days foundation.(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
1st class brick work with M-150 brick with cement & fine sand of 1.25FM. in 1:4 S.I.No 305B. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Struck Cement Pointing with cement mortar 1:2 S.I. No 574(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
RCC Hume Pipe NP-3 (350mm) including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Plain cement concrete in open foundation complete and as per drawing technical specifications. (M-15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 & 1800 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Plain cement concrete in open foundation complete and as per drawing technical specifications. (M-20) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 & 1800 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
PART-B Maintenance cost will be paid year wise as per Government order No 17/2024/SA-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No.3689 COPRMC/Mul-23-24 Date 17-02-2024 Maintenance cost will adjusted as per final cost of construction and will be paid accordingly.
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 1st Year Maintenance charge @ 0% of Sub toal of Part-A work done (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 2nd Year Maintenance charge @ 0.25% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 3rd Year Maintenance charge @ 0.50% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 4th Year Maintenance charge @ 0.75% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 5th Year Maintenance charge @ 1.00% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2065715.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .