Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | 1 | Accepted-AOC Awarded |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
15 Apr 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/CEDC/North/CBE
Office of the Superintending Engineer/CEDC/North/ Coimbatore
Central Stores/ Coimbatore
2025_EB_537200_1
SE/CEDC/N/CBE/C/No.20/2024-25
Open Tender
Civil Works
Works
60 days
Tatabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
Yes
20 May 2025
1 Apr 2025
16 Apr 2025
1 Apr 2025
15 Apr 2025
1 Apr 2025
Amount
Earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification.
Plain cement concrete in CC 1:3:6, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, etc., complete but excluding cost of steel reinforcement.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for gate pillar including cost of all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement.
Refilling foundation with gravel including cost of all materials labour all leads and lifts , watering, consolidation etc., complete as per standard specification and as per direction of the Engineer incharge.
Plastering with CM 1:5, 12 mm thick including the cost of all material, labour charges, lead, lift etc. complete.
Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification.
Colour washing two coats using exterior emulsion paint over one coat of primer for outer wall including cost of all materials, labour, curing, all leads & lifts etc., complete.
Supplying and fixing in position of MS main gate with wicket gate using 16 gauge M.S.Sheet including cost of all materials/accessories, lead, lift, etc. with proper locking arrangements as directed by the engineer at site including cost of painting with two coats of enamel paint over with one coat of red oxide.
Disposal of excess of surplus earth away in low lying area with a head load lead 100m and lorry lead of 5 km including spreading, levelling, labour, leads, lifts etc., complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .