Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAdmitted-Finance RAJKOT GUJARAT 360001 UDYAM GJ 20 0026045 08AABCI7583C1ZJ B 24AABCI7583C1ZP R 36AABCI7583C1ZK B 07AABCI7583C1ZL B 24AABCI7583C1ZP B 27AABCI7583C1ZJ B 05AABCI7583C1ZP B 22AABCI7583C1ZT B 09AABCI7583C1ZH B 23AABCI7583C1ZR B 29AABCI7583C1ZF B 10AABCI7583C1ZY B 20AABCI7583C1ZX B 19AABCI7583C1ZG B 04AABCI7583C1ZR B 21AABCI7583C1ZV B 33AABCI7583C1ZQ B 18AABCI7583C1ZI B 06AABCI7583C1ZN B 30AABCI7583C1ZW B 01AABCI7583C1ZX B 03AABCI7583C1ZT B 32AABCI7583C1ZS B 02AABCI7583C1ZV B MSME STATUS AS NOT VERIFIED | RAJKOT | GUJARAT | 360001 | ₹21.0 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ishan Netsol Private Limited L1 |
|---|---|---|---|---|
| 1.00 | Item Code [Lease Circuit300 MBPS]:Item Type [Electrical] ::Supply ,Installation,Testing,Commissioning of 300 MBPS 1:1 Lease Line Dedicated at UDA Premises (Google Co-Ordinates 192.168.47.10) All work relating to release of connection and all necessary permissions have to obtain by Contractor on his Own Expenses as per scope of work & Last Mile Fiber along with the RF protection for the internet Leased Line and Maintenance Work up to Three Year. | 36 | Each | 58,329 ₹20,99,844 Lowest |
Tender Value
₹23.4 L
EMD Value
₹46,800
Closing Date
1 Apr 2026, 6:00 pmClosed
EXECUTIVE ENGINEER-ELE.
UDA Office Udaipur
SITCM of Internet Bandwidth 300MBPS with Public IP Pool and For Internet Security Installed Hardware Firewall Installed at UDA Premises. 8705
2026_UITUD_546455_1
NIT_87_05
Open Tender
Electrical Works
Item Rate
1095 days
Udaipur
Please Refer Tender Document
2 documents required · 2 mandatory
₹590
Refer Tender Document
₹46,800
Yes
8 Apr 2026
16 Mar 2026
2 Apr 2026
16 Mar 2026
1 Apr 2026
16 Mar 2026
Item Code [Lease Circuit300 MBPS]:Item Type [Electrical] ::Supply ,Installation,Testing,Commissioning of 300 MBPS 1:1 Lease Line Dedicated at UDA Premises (Google Co-Ordinates 192.168.47.10) All work relating to release of connection and all necessary permissions have to obtain by Contractor on his Own Expenses as per scope of work & Last Mile Fiber along with the RF protection for the internet Leased Line and Maintenance Work up to Three Year.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_974550.xls
BOQ • 0.34 MB
Condition_05.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].