Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
23 Jun 2026, 5:00 pm
CCE Dhenkanal R and B Circle
CCE Dhenkanal R and B Circle
Construction of 4 nos D type staff quarters at CHC Kaniha
2026_EICCL_131557_1
CCE DKL R and B/04-2026-27
Open Tender
Civil Works - Buildings
210 days
Angul
Please refer tender documents
2 documents required · 2 mandatory
₹10,000
₹1.9 L
Yes
9 Jun 2026
9 Jun 2026
24 Jun 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-1 Civil Works
Dismantling brick or stone masonry in clay under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead etc complete as per direction of Engineer-in-Charge. | 34.87 | Cum | 920.2 | ₹32,087.37 |
| 2 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead etc complete as per direction of Engineer-in-Charge. | 5.88 | Cum | 1,731.8 | ₹10,182.98 |
| 3 | Disposal of building rubbish / malba /rock/ similar unserviceable, dismantled or waste materials by mechanical means within 1km Lead away from the site, including loading, transporting, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including cost of equipments/ labour, conveyance, T&P and taxes etc. as per the direction of Engineer-in-charge. | - | Cum | 278.8 | - |
| 4 | Dismantling and removing doors, windows and ventilators,ceilings, partitions etc including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead etc complete as per direction of Engineer-in-Charge. | 108.94 | Sqm | 465.1 | ₹50,667.99 |
| 5 | Clearing and grubbing land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works Latest Revision & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,022 | Sqm | 8.63 | ₹8,819.86 |
| 6 | Earth work excavation in foundation trenches in all kind of soil including dressing and leveling the bed up to required depth and depositing the excavated materials at places away from work site within 50mtr initial lead and 1.5mtr initial lifts T&P shoring shuttering dewatering if required etc. complete as per direction of the Engineer-in-charge. | - | - | - | - |
| 7 | Upto 1.5 Mtr Depth | 606.8 | Cum | 311.5 | ₹1,89,018.2 |
| 8 | From 1.5 Mtr upto 3.0 Mtr Depth | 175.6 | Cum | 334 | ₹58,650.4 |
| 9 | Supplying, diluting and preparing chemical emulsion like CHLORPYRIPHOS or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as pre-constructional anti termite treatment and creating a chemical barrier under and around wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, surrounding the pipes and conduits etc. complete at the rate of 7.5 liters (or as directed by the manufacturer) per sqm on vertical and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center etc.complete as per IS:6313/1981(Part-II) and as per the direction of the Engineer -in-charge including all cost of materials, labour and T&P etc all complete. | 505.8 | Cum | 104.5 | ₹52,856.1 |
| 10 | Supplying filling in foundation and plinth with sand in layers not exceeding 150mm thick including watering, ramming including cost, conveyance, royalty and taxes of all materials, all labour T&P required for the work etc. complete (measurement will be taken on finished compacted section only). | 753.7 | Cum | 568 | ₹4,28,101.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_595428.xls
BOQ • 0.47 MB
DTCN_Dtype_Kaniha.pdf
Tender Documents • 2.66 MB
Download all tender documents and submit your bid