Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5 LAccepted-AOC FATEHABAD HGVY | FATEHGARH SAHIB | PUNJAB | 140402 | 1 | Accepted-AOC l1 | |
| 2 | 2₹3,500+₹500 (16.7%)Rejected-Finance | 2 | Rejected-Finance l2 | |
| 3 | 3₹4,000+₹1,000 (33.3%)Rejected-Finance CHANDIGARH | NA | NA | 160001 | 3 | Rejected-Finance l3 | |
| 4 | 4₹5,000+₹2,000 (66.7%)Rejected-Finance 1 VPO ABDULGARH 133205 | ABDULGARH | AMBALA | HARYANA | 133205 | 4 | Rejected-Finance l4 | |
| 5 | 4₹5,500+₹2,500 (83.3%)Rejected-Finance | 4 | Rejected-Finance l4 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
9 Nov 2023, 3:00 pmClosed
MD
The Shahabad Cooperative Sugar Mills Ltd
Lifting / Disposal / Ash Handling of Boiler Collected Ash from Air Pollution Control Device Complete Unit
2023_HBC_326455_1
Ash Handling of Boiler Collected Ash
Open Tender
Miscellaneous Goods
Item-rate/Agreement basic
The Shahabad Cooperative Sugar Mills Ltd
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
₹50,000
Yes
7 Dec 2023
4 Nov 2023
9 Nov 2023
4 Nov 2023
9 Nov 2023
4 Nov 2023
4 Nov 2023 - 8 Nov 2023
Lifting & cleaning of Boiler Ash Handling Season 2023-24
A. ESP Unit ash handling on daily basis for crushing season 2023-24. 1. Lifting & cleaning of boiler ash from boiler furnace hoppers & its ground floor area, air pre heater hoppers & its ground floor area, E.S.P hoppers & its ground floor area & area around all ash belt conveyors, all ash screw conveyors, area around ID fans, FD fans, SA fans, surrounding area of RO water plant & feed pumps at 125 TPH boiler. 2.Loading of ash will be done directly from ash silo in tractor trolley & to be shifted outside mill premises. Quantity of Ash: 4 to 5 tons/hr appx. 3.Regular cleaning of floor area of boiler, ESP & its surroundings. 4. Lifting & shifting of ash from floor area of ESP & Boiler during general cleaning, shut down of boiler equipments etc.
B. Following jobs to be done on daily basis during crushing season 2023-24: 1. Dismantling of man holes covers of 10 nos. ash hoppers of ESP & Air pre heater. 2. Cleaning of ash hoppers & fitting of manholes covers & tightening of the same. 3. Checking & cleaning of ash from discharge chute of 03 nos ash hoppers of mud drum ash hoppers. 4. Cleaning of hoppers platforms, sweeping, stacking & lifting of ash from ground floor.
Following jobs to be done on daily basis during crushing season 2023-24: 1. Cleaning of ash from structure & platforms of submerged, common & long ash belt conveyor structure & platforms etc. 2. Cleaning, sweeping& lifting of ash from Drain / pits along with submerged, common & long ash belt conveyor, ESP &up to Raw water RCC storage tank.
C. Wet scrubber unit ash handling on daily basis for crushing season 2023-24. 1. Lifting & cleaning of boiler ash produced from wet scrubber unit & its ash pits, ash clarifiers, ash screw conveyors etc. 2. Lifting & cleaning of boiler ash from boiler furnace hoppers & its ground floor area, air pre heater hoppers & its ground floor area, E.S.P hoppers & its ground floor area & area around all ash belt conveyors, all ash screw conveyors, area around ID fans, FD fans, SA fans, surrounding area of RO water plant & feed pumps at 125 TPH boiler. 3. Loading of ash will be done directly from ash silo in tractor trolley & to be shifted outside mill premises. Quantity of Ash: 4 to 5 tons/hr appx. 4. Regular cleaning of floor area of boiler, ESP & its surroundings, wet scrubber & its surroundings. 5. Lifting & shifting of ash from floor area of ESP & Boiler during general cleaning, shut down of boiler equipments etc.
The Punia Cooperative Labour and Constuction Society Ltd
M/s Sandhu Fuel Briquette
M/S Sandhu Bio Fuels
M/s Sukhmani Enterprises
M/s Navneet Singh and CO.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .