Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
Closing Date
24 Feb 2026, 3:00 pmClosed
BDO(BP)
Panchayat Union Office , Thirumangalam
Madurai District Renovation Of Panchayat Union Primary School RCC Building (South Facing) in Alampatty Village Thirumangalam Panchayat
2026_RDTN_664280_1
13-TMM/Building Maintanance)-2025-26
Open Tender
Civil Works
Works
120 days
Thirumangalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
24 Feb 2026
22 Feb 2026
24 Feb 2026
22 Feb 2026
24 Feb 2026
22 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:Madurai District Renovation Of Panchayat Union Primary School RCC Building (South Facing) in Alampatty Village Thirumangalam Panchayat | - | - | - | - |
| 2 | Dismantling,clearing away and from useful for re use for any thickness of walls for Clean removal of cement plaster from walls (Sch No.320) P28 | 104.88 | Sqm | - | - |
| 3 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and all labour charges etc complete | 61.2 | Sqm | - | - |
| 4 | Plastering in CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 29.4 | Sqm | - | - |
| 5 | Dismantling of damaged one coursed Pressed tiles including all labour charges etc..,(W-0038) | 61.2 | Sqm | - | - |
| 6 | Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete. | 61.2 | Sqm | - | - |
| 7 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 75.48 | Sqm | - | - |
| 8 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 168.69 | Sqm | - | - |
| 9 | Re Painting the walls with one coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 96 | Sqm | - | - |
| 10 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 22.2 | Sqm | - | - |
finance_797579.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_797579.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .