| 1 | L1₹29.8 LAccepted-Finance | L1 | Accepted-Finance Lower than L2 | |
| 2 | L2₹33.7 L+₹3.9 L (13.1%)Accepted-Finance | L2 | Accepted-Finance Greater than L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Required Paper Not Attach | |
| 4 | Rejected-Technical | - | Rejected-Technical Required Paper Not Attach |
| Sl No | Description | Qty | Unit | M S Electricals L2 | BHARDWAJ ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Carriage of all petty material / LT Cable of estimate, from Electricity store center, Hapur to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Hapur/Ghaziabad/Bulandshar (0-50 Km) | 10 | Qtl. | 230 ₹2,300 Lowest | 2,200 ₹22,000 |
| 2.00Carriage of following material from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Hapur/Ghaziabad/ Bulandshar (0-50 Km). | |||||
| 3.00 | (a) PCC Pole 8.5 mtrs. Long | 10 | Nos. | 600 ₹6,000 Lowest | 4,500 ₹45,000 |
| 4.00Carriage of following capacity transformer from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Hapur/Ghaziabad/ Bulandshar (0-50 Km). | |||||
| 5.00 | (a) 25/63/100 KVA | 5 | Nos. | 4,000 ₹20,000 | 3,500 ₹17,500 Lowest |
| 6.00 | (b) 250 KVA. | 21 | Nos. | 6,000 ₹1,26,000 | 5,500 ₹1,15,500 Lowest |
| 7.00Erection of double pole structure with all accessories on following pole fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, as per direction of site incharge. | |||||
| 8.00 | (a) PCC Pole 8.5 mtr. Long | 5 | Nos. | 6,800 ₹34,000 Lowest | 13,000 ₹65,000 |
| 9.00Safely installing the New following capacity transformer with the help of crane/manual labour at LT Sub-Station Double Pole/Plinth, as per direction of site incharge. | |||||
| 10.00 | (b) 25 KVA | 5 | Nos. | 3,000 ₹15,000 | 2,500 ₹12,500 Lowest |
Tender Value
₹30.0 L
EMD Value
₹29,990
Closing Date
16 Sept 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EDC HAPUR
CAPACITY ENHANCEMENT WORK OF DISTRIBUTION TRANSFORMERS OF VARIOUS CAPACITIES UNDER BUSINESS PLAN 2025-26 26 WORK IN THE AREA, IN THE JURISDICTION OF EDD-HAPUR, UNDER EDC., HAPUR.
2025_PVVNL_1071473_1
22(W)/EDCH/2025-26
Open Tender
Electrical Works
Item Rate
HAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SUPERINTENDING ENGINEER, EDC, HAPUR
₹29,990
Yes
26 Sept 2025
5 Sept 2025
16 Sept 2025
5 Sept 2025
16 Sept 2025
5 Sept 2025
Amount
Carriage of all petty material / LT Cable of estimate, from Electricity store center, Hapur to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Hapur/Ghaziabad/Bulandshar (0-50 Km)
Carriage of following material from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Hapur/Ghaziabad/ Bulandshar (0-50 Km).
(a) PCC Pole 8.5 mtrs. Long
Carriage of following capacity transformer from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Hapur/Ghaziabad/ Bulandshar (0-50 Km).
Erection of double pole structure with all accessories on following pole fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, as per direction of site incharge.
(a) PCC Pole 8.5 mtr. Long
Safely installing the New following capacity transformer with the help of crane/manual labour at LT Sub-Station Double Pole/Plinth, as per direction of site incharge.
Laying of Cable of various size and complete work properly, as per RESPO/Norms, and as per direction of site incharge.(Rate will be charge as per actual length of work).
(a) LT PVC 4x16 Sq.mm.
(b) Three Phase LT PVC Cable 3.5x150/3.5x400 Sq.mm.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site incharge.
Grouting of following ST/PCC supports in CC 1:3:6 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge.
PCC Pole 8.5 mtr. Long
Construction of T/F plinth suitable for 160/250/400 KVA T/F (size of 2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:3:6 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour, as per direction of site incharge.
Erection & Fixing of 11KV. Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. (Only Fuse Set and required M.S angle/Channal will be provided by the Department.
Erection & Fixing of 11KV. TPMO set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. (Only TPMO Set with required M.S angle/channel will be provided by the Department).
Construction of safety fencing (MS) size 3x3x2 mtr. for Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle/T-iron to be fitted on vertical posts. Pickets (if required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 75x75x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge.
Providing & Fixing of Danger Board, including fixing of all accessories by providing all required materials (like suitable clamps, nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge.
Saftly dismantling work properly and carriage of old & used T/F from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
10 to 25 KVA
Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body/neutral earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
Jumpheing work of LT/HT line for proper energization of line.
Providing and fixing copper L Piece proper size at both end LT Cable as per direction of site incharge
Copper L Piece 50x225x10 mm
Copper L Piece 62x225x12 mm
Providing and fixing of Aluminium Lug suitable for 250/400/630 KVA D/T at and direction of site incharge.
Providing, fabricating, carrying & fixing of Tailless Fuse Unit Hook type arrangement. circuit having 3 Phase Neutral arrangement in Box / frame made of 65cmx65cmx5mm frame MS Angle with heavy duty Aluminium Lugs suitable for 500 Amp load on at least 2 ft height from ground on plinth for safe installation or fixing of tailless unit at MS angle frame on Plinth horizontally/vertically as per site requirement on available Plinth at safe height as per site conditions for electrical safety with making the connection at 250 KVA) T/F and line side complete Each job includes 3 Tail Less Units.
M S Electricals (BID ID -5537037)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .