Tender Value
₹3.3 L
EMD Value
₹8,275
Closing Date
17 Nov 2025, 9:30 pmClosed
Directorate of Municipal Administration
Repair installation and commissioning of H.T. Metering Cubical installed at Arendur Jackwell Power Plant for drinking water supply to Siddapur town.
DMA/2025-26/WS/WORK_INDENT51166
DMA/2025-26/WS/WORK_INDENT51166
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
DMA Town Panchayat Siddapura
₹500
₹8,275
3 Nov 2025
3 Nov 2025
19 Nov 2025
16 Nov 2025
Repair installation and commissioning of H.T. Metering Cubical installed at Arendur Jackwell Power Plant for drinking water supply to Siddapur town.
Supply of CT's - Current Transformer type indoor, "Resin cost" Ratio-5/1A Class-0.2S burden 2.5 VA, System Supply voltage 11KV/440Volts-1 LV/15/38/95-KVP three phase frequency 50/60 Hz. Insulation Cla...
Supply of PT's - Potional Transformer type indoor "Resin cost" Ratio-11KV/110V 0.2Class burden 15VA with accecurary class testing of high voltage standing three seconds etc., complete.
Supplying and fixing 11KV/185 Sqmm Heat Shrinkable HT Cable Termination indoor and outdoor pot head kit
Alluminum Bus Bar Insulators for HT metering cubicle 'Ricon Cost" moulded with hpoxy made to heat moulded.
Alluminum Bus Bar stripps 6x40x1000mm
CT's and PT's Testing of HESCOM Authorised Assistant Executive Engineer (Ele) SSLB-Sub Division HESCOM Hubballi. Testing fees
HT MRT HESCOM Sirsi Assistant Executive Engineer (Ele) Metering cubicle division Sirsi. Testing of PC and TC pre commissioning and rating of electronics trivector energy meter for testing fees.
11KV HT Termination Resin cost Busbar Insulator Heavy duty verticle type sloted bush
Hardware Materials Brass Nuts and Bolts size 19mm x 150mm
Nikil Coated nut and Bolts size 19mm x 80mm
Removing of Burnt CT's and PT's with all accessories to connected existing metering cubicle inside the panel and 95sqmm HT cable hardware materials etc.,
Fixing of all new materials installing same original position before as it is to function of complete accuracy measurement to energy devices. To 100% properly functioning of transformer power supply f...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .