Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹86.4 LAccepted-AOC N A | ₹86.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹87.1 LRejected-Finance | ₹87.1 L | 2 | Rejected-Finance L2 |
| 3 | 3₹89.0 LRejected-Finance 538 RAJPOOT COLONY SHIVAJI NAGAR JHANSI | JHANSI | JHANSI | UTTAR PRADESH | ₹89.0 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S RADHIKA RAMAN YADAV THEKEDAR L2 | SRIVASTAVA CONSTRUCTION L1 | M/S PUSHPENDRA ENGINEERING ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dag belling 7.5 Cms. Deep i/c all cost of material labour,T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 0.18 | Per line/m | 350 ₹63 | 358.5 ₹64.53 | 290 ₹52.2 Lowest |
| 2.00 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 4.50 maverage lift complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 497.57 | Cum | 94 ₹46,771.58 | 108.2 ₹53,837.07 | 80 ₹39,805.6 Lowest |
| 3.00 | Dismantling bricks or stone masanory in lime or cement mortar i/c stacking etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 22.96 | Cum | 410 ₹9,413.6 | 469.2 ₹10,772.83 | 300 ₹6,888 Lowest |
| 4.00 | Dismantling existing plaster including disposal/stacking of refuse within a distance of 60 m complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 282.04 | Sqm | 50 ₹14,102 | 55.2 ₹15,568.61 | 40 ₹11,281.6 Lowest |
| 5.00 | S/L first class B.W work in 1:4 C.M.I/C cost of all material labour & T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 260.88 | Cum | 6,300 ₹16,43,544 | 5,426 ₹14,15,534.88 Lowest | 7,000 ₹18,26,160 |
| 6.00 | S/ Laying 12.5 mm thick 1:3 cement plaster on brick work i/c all labour T&P etc complete complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 2,423.84 | Sqm | 135 ₹3,27,218.4 Lowest | 156.61 ₹3,79,597.58 | 150 ₹3,63,576 |
| 7.00 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 486.72 | Sqm | 94 ₹45,751.68 Lowest | 113.6 ₹55,291.39 | 200 ₹97,344 |
| 8.00 | Centring and shuttering for C.C. work including all cost of material labour T&P complete required for propar completion of work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 186 | Sqm | 280 ₹52,080 | 312.8 ₹58,180.8 | 270 ₹50,220 Lowest |
| 9.00 | Laying of M-10 (1:3:6) cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete the work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 50.78 | Cum | 3,700 ₹1,87,886 | 3,100 ₹1,57,418 Lowest | 3,500 ₹1,77,730 |
| 10.00 | Laying of M-15(1:2:4) cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete the work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 39.46 | Cum | 4,300 ₹1,69,678 | 3,600 ₹1,42,056 Lowest | 4,500 ₹1,77,570 |
Tender Value
₹98.7 L
EMD Value
₹2.0 L
Closing Date
24 Jul 2026, 11:00 amClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle IW Jhansi
LOT-02 Restoration Work of the Inspection House Situated at Garhmau Lake in District Jhansi.
2026_UPIDC_1159537_8
01/SE-IV/2026-27
Open Tender
Civil Works
Item Rate
210 days
Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,170
₹2.0 L
25 Aug 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dag belling 7.5 Cms. Deep i/c all cost of material labour,T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 0.18 | Per line/m | 358.5 | ₹64.53 |
| 2 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 4.50 maverage lift complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 497.57 | Cum | 108.2 | ₹53,837.07 |
| 3 | Dismantling bricks or stone masanory in lime or cement mortar i/c stacking etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 22.96 | Cum | 469.2 | ₹10,772.83 |
| 4 | Dismantling existing plaster including disposal/stacking of refuse within a distance of 60 m complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 282.04 | Sqm | 55.2 | ₹15,568.61 |
| 5 | S/L first class B.W work in 1:4 C.M.I/C cost of all material labour & T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 260.88 | Cum | 6,426.06 | ₹16,76,430.53 |
| 6 | S/ Laying 12.5 mm thick 1:3 cement plaster on brick work i/c all labour T&P etc complete complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 2,423.84 | Sqm | 156.61 | ₹3,79,597.58 |
| 7 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 486.72 | Sqm | 113.6 | ₹55,291.39 |
| 8 | Centring and shuttering for C.C. work including all cost of material labour T&P complete required for propar completion of work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 186 | Sqm | 312.8 | ₹58,180.8 |
| 9 | Laying of M-10 (1:3:6) cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete the work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 50.78 | Cum | 3,926.77 | ₹1,99,401.38 |
| 10 | Laying of M-15(1:2:4) cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete the work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. | 39.46 | Cum | 4,678.62 | ₹1,84,618.35 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
01SEIVNIT2026-27.pdf
Tender Documents • 2.71 MB
BOQ_2195970.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].