Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LQualified Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP | Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP | L1 | Qualified | |
| 2 | L2₹1.4 L+₹1,615 (1.14%)Qualified Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP 0 0 BASANT AVENUE PHASE II PUNJAB GURDASPUR PUNJAB 143505 | GURDASPUR | PUNJAB | 143505 | Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP | L2 | Qualified | |
| 3 | L3₹1.4 L+₹3,205 (2.27%)Qualified Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP | Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP | L3 | Qualified | |
| 4 | Disqualified Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP 1093 GALI NO 6 JAWAHAR NAGAR HISAR HARYANA | HISAR | HARYANA | 125001 | Make: NA
Model: FUSE WIRE COPPER TINNED 20 AMP | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
8 Sept 2025, 8:00 pmClosed
Fuse Wire as per IS 9926 (Q3)
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6617512 Dated : 28-08-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Fuse Wire as per IS 9926 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : CWE Commander Works Engineer Army Mudfort Secunderbad
Department of Military Affairs
Indian Army
Ministry of Defence (Cwe Army Secunderabad) Splitting 2/8
8275969
GEM/2025/B/6617512
Two Packet Bid
Fuse Wire as per IS 9926
25 days
HYDERABAD
Total value wise evaluation
PRODUCT
7 documents required · 7 mandatory
₹31
80%
Exempted
28 Aug 2025
28 Aug 2025
8 Sept 2025
Fuse Wire as per IS 9926 (Q3)
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6617512 Dated : 28-08-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Fuse Wire as per IS 9926 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : CWE Commander Works Engineer Army Mudfort Secunderbad
Department of Military Affairs
Ministry of Defence (Cwe Army Secunderabad) Splitting 2/8
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8275969.pdf
GEM_BID
9ATCFus_b3f70af1-8bab-4acb-a5121756349967088_sbso_hyd.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .