Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance PADAM NAGAR RAMPUR BUSHAHAR | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.1 L+₹10,929.16 (2.21%)Rejected-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.1 L+₹17,387.30 (3.52%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹4,967
Closing Date
17 Mar 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Resident Engineer
Resident Engineer, Ganvi Power House Division, HPSEBL, Jeori.
Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and Pl results, and alignment and commissioning
2025_HPSEB_101538_1
HPSEBL/GPHD/DB-9/2024-25-51
Open Tender
Repair and Maintenance Works
Percentage
45 days
chaba
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹4,967
24 Mar 2025
10 Mar 2025
18 Mar 2025
10 Mar 2025
17 Mar 2025
10 Mar 2025
eProcurement System Government of Himachal Pradesh Created By: Ashutosh Thakur Created Date/Time: 22-Mar-2025 12:33 PM Tender Title: Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and Pl results, and alignment and commissioning Tender ID: 2025_HPSEB_101538_1
Tender Inviting Authority: Resident Engineer, Ganvi Power House Division, HPSEBL, Jeori.
Name of Work: "Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and Pl results, and alignment and commissioning of Unit No. VI of Chaba HEP.
Contract No: HPSEBL/GPHD/2024-25 -51
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Sanjeev kumar (GSTN-NA) BID ID -503031 421000.00 1.70 505225.26 Five Lakh Five Thousand Two Hundred and Twenty Five
2.00 Ashutosh Kalia Contractor (GSTN-NA) BID ID -501790 421000.00 3.00 511683.40 Five Lakh Eleven Thousand Six Hundred and Eighty Three
3.00 Nitin Krate (GSTN-NA) BID ID -501473 421000.00 -.50 494296.10 Four Lakh Ninty Four Thousand Two Hundred and Ninty Six
Lowest Amount Quoted BY: Nitin Krate(494296.10)
BOQ Summary Details Tender Title: Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and Pl results, and alignment and commissioning Tender ID: 2025_HPSEB_101538_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Nitin Krate (BID ID -501473) 494296.10 L1
2 Sanjeev kumar (BID ID -503031) 505225.26 L2
3 Ashutosh Kalia Contractor (BID ID -501790) 511683.40 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .