Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance NA | -26.00% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 LAdmitted-Finance | -13.00% | ₹2.1 L | L2 | Admitted-Finance |
| 3 | L3₹2.3 LAdmitted-Finance | -4.00% | ₹2.3 L | L3 | Admitted-Finance |
| 4 | L4₹2.4 LAdmitted-Finance | +1.00% | ₹2.4 L | L4 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,830
Closing Date
19 Aug 2026, 6:00 pmClosed
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_320422_3
NIT NO 13.1 OF REW RAMBAN 2026 27 BLOCK GANDHRI INDER HEAD PRI/DDC/BDC/APDP/ABDP
Open Tender
Civil Works
Percentage
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,830
27 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed,25 meter beyond 1 m from cutting edge All kinds of soil | - | cum | 479.3 | - |
| 2 | Dry Random Rubble stone masonry with hard stone in foundation and plinth using nallah stone without bond stone. | - | cum | 2,793.8 | - |
| 3 | Providing and laying of dry stone solling | - | cum | 1,205 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 6,591.25 | - |
| 5 | Centering and Shuttering including strutting and propping etc.and removal of form for edges | 1 | sqm | 286.35 | ₹286.06 |
| 6 | Carriage of Cement | - | MT | 759.75 | - |
| 7 | Carriage of Sand | 1 | cum | 2,306.54 | ₹2,304.23 |
| 8 | Carriage of Aggregate | 1 | cum | 1,136.3 | ₹1,135.16 |
| 9 | Carriage of Stones | - | cum | 541.98 | - |
| 10 | CIB (citizen information board) size 2'6" x 3' 6" x 0' 9"(above plinth level)with tepered top havind 20 degree slope in Brick masonary including plaster , paint ,leterring and logos (On Granite Stone with Engraved letters) as per instruction of Engineer-in-charge including carriage of material (complete job) | - | no | 4,000 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BOQ_1065219.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].