| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹105.5 CrAccepted-AOC | ₹105.5 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹105.5 CrRejected-Finance | ₹105.5 Cr | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹114.0 CrRejected-Finance | ₹114.0 Cr | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹144.7 CrRejected-Finance CIGNUS 14TH 15TH FLOOR PLOT NO 71A KAILASH NAGAR MAYUR NAGAR PASSPOLI POWAI MUMBAI MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400087 | ₹144.7 Cr | L4 | Rejected-Finance Not L1 Bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Agency is not meeting NIT Criteria. |
Tender Value
₹117.0 Cr
EMD Value
₹1.4 Cr
Closing Date
15 Feb 2019, 6:00 pmClosed
Sr. Manager (Engg-Civil), AAI, CHQ-NR
CHQ, B-Block, 3rd Floor, Room No. 372, Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi - 110003
Development of New Civil Enclave at Kanpur (Chakeri) Airport - On Design and Build Basis (i/c Civil, Mechanical, Electrical, Plumbing, Fire Fighting, HVAC, Airport System, IT System, Art Works, Pavements and other Ancillary Buildings)
2018_AAI_17848_1
AAI/CHQ-NR/Engg(C)/KANPUR/CE
Open Tender
Civil Works
487 days
Kanpur
As per WNIT
8 documents required · 8 mandatory
₹11,200
Airports Authority of India
₹1.4 Cr
4 May 2022
29 Nov 2018
21 Feb 2019
29 Nov 2018
15 Feb 2019
22 Dec 2018
29 Nov 2018 - 17 Dec 2018
Amount
CIVIL WORKS
All design works including but not limited to concept/ schematic design, detailed design, Architectural Drawings, Structural Design, Interior Design, Landscape Design, Working drawings, Shop drawings and As Built drawings of Works.
Execution of all Civil works for Terminal Building (Gr. Floor + First Floor) including RCC Works, Masonary Works, Structural Steel Works, Roofing System, Façade System, Aluminium Composite Panel, Tubeline Metal Ceiling, etc. as per drawings.
All internal works including finishing but not limited to Masonry Work, Staircase, Lift Shaft, Plaster, Internal Partitions, Doors, Windows, Fittings & Fixtures, Painting, Interior Finishing Works, Flooring, Stainless Steel Railing, False Ceiling, Raised/Access Flooring etc. as per approved drawing and specifications as per direction of EIC.
Cubical Toilets as per the approved layout & design but not limited to complete plumbing and sanitary work, flooring, wall tiling, false ceiling, all fittings and fixtures, wash basin, water closet, mirrors, sensor urinals, etc. complete as per direction of EIC.
Furniture & Furnishing of VIP room, Check-in-counters, Frisking booth counter, Manual Baggage Check Counters as per drawings, S.S. Que–Management System, SS dustbins, Modular Mattings, SS Bollards, Planters etc.
Finishing of columns in City Side and Air Side of Terminal Building with GFRC of approved make and shade as per approved Design, Drawings and Specifications including supporting structure as required.
Art Works (Design & Execution).
Site Development including Construction of City Side Roads & Approach Roads/Air Side Roads in front of Terminal Building, Perimeter Road 3.5m wide all along the Boundary Wall, Road Connecting Apron to GSE Area, Car Parking Area, Kerbs, Footpaths etc. Note: Pavement Type – Rigid Pavements Footpaths – Paver Block
Landscaping works, Water body & Horticulture works.
Operational Boundary wall (Segregating Air Side & City Side Area), Gates at entry & exit including Guard Rooms/ Morchas/ Security Booths. Note: Length of Operational wall = 250 Mtrs. Approx.
Miscellaneous Works viz. Bore well-02 Nos., Under Ground Static Tank, Rain Water Harvesting (Civil Works), Internal & External Water Supply System, Drainage System, Storm Water Drainage etc.
All Civil Works for Sewage Treatment Plant (STP)-50 KLD and Solid Waste Disposal System.
Utility buildings – Execution of all civil works for Substation cum Office Building/Pump Room but not limited to RCC Framed Structure, Masonary works, Flooring, finishing works, Rolling Shutters, Doors, Windows, all fittings and fixtures etc. including provision of water storage tanks for various uses etc. complete in all respect. Approximate Area of Substation Building - 750 Sqm
Pavement works: Construction of Apron and Link Taxi Track with 3.5mtr wide shoulders, GSE Area etc. Note: Pavement Type - Rigid Pavements.
ELECTRICAL WORKS
Internal and External EI, Light & power plug points, Hand driers, lighting, External Lightings i/c car park & approach road, street lighting, lightning protection, etc.
Sub-station work i/c DG sets with synchronization panels, Transformers, HT & LT Panels, Cabling, APFC with detuned filters, Earthing and UPS (for lighting), batteries and battery charger etc.
Fire Pumps ,Fire Hydrant, Fire Sprinkler System, gas suppression system & Portable fire extinguishers
Addressable Fire detection & Alarm System
Elevator 13 pax
HVAC, Split/VRV/VRF/Precision Type AC, Unitary AC, Cabinet AC for Servers, IBMS, inline fans,air lock lobby, Air Curtains etc.
Water Supply System/ Public Health Engineering i/c hydropneumatic Pumps, Borewell Pumps, starters, Water Treatment Plant.
Sewage treatment Plant with MBBR technology
Water coolers with inbuilt RO System etc
Automatic Sliding Doors
Operational area trolley gate
Indoor & outdoor ( i/c emergency) Wayfinding illuminated signages.
Solar power plant
Ground Lighting Facility i/c Apron, Taxiway lights, CCR, Remote control desk, guidance signage, Apron High Mast etc.
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
Airport Systems & IT Systems
SITC of Public address & voice alarm system & car calling system, Surveillance Close circuit TV system (SCCTV), Flight Information Display System (FIDS), UPS (for AS&IT), Telephone Exchange/Digital EPABX/IP EPABX system i/c telephone/intercom instruments.
SITC of Passive and Active Networking components, Access Control System as per BCAS requirement, Provision of Internet, VPN bandwidth, Wi-fi system, Distributed Antenna System (DAS).
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Digital EPABX/ IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Digital EPABX/ IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Digital EPABX/ IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Digital EPABX/ IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Digital EPABX/ IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking, Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking, Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking, Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking, Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking, Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Access Control system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) First year after DLP
All inclusive Comprehensive Maintenance of Access Control system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Second year after DLP
All inclusive Comprehensive Maintenance of Access Control system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Third year after DLP
All inclusive Comprehensive Maintenance of Access Control system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Fourth year after DLP
All inclusive Comprehensive Maintenance of Access Control system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Fifth year after DLP
All inclusive Comprehensive Maintenance of DAS (Distributed antenna system) system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) First year after DLP
All inclusive Comprehensive Maintenance of DAS (Distributed antenna system) system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Second year after DLP
All inclusive Comprehensive Maintenance of DAS (Distributed antenna system) system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Third year after DLP
All inclusive Comprehensive Maintenance of DAS (Distributed antenna system) system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Fourth year after DLP
All inclusive Comprehensive Maintenance of DAS (Distributed antenna system) system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified.(the response time in case of breakdown shall not be more than 8 hours) Fifth year after DLP
Note 1: All works to be carried out as per conceptual drawings/ design intent enclosed with tender documents with all materials, labour, T & P, machinery, equipment, consumables, deployment of suitable Technical personnel for supervision, quality assurance and quality control etc. complete and work to be completed based on approved architectural, structural drawings, specifications, design parameters and as per directions of Engineer-in-Charge including obtaining necessary approvals and NOCs from the concerned authorities. 2. Detailed scope of work as given in the AAI’s requirement – Tender Document may also be referred. 3. The information contained in these Tender Documents, being indicative in its nature, are being provided for the limited purposes of enabling the Tenderers to prepare a tender. These Tender Documents are a summary of available information and no reliance shall be placed on any information or statements contained herein, and no liability is or will be accepted by the AAI in relation to the accuracy, adequacy or completeness of such information or statements made, nor shall it be assumed that such information or statements will remain unchanged. 4. By filling the lump sum price bidder have carefully considered all aspects of the Works, including the designs, specifications, scope of work, methodologies, programs and cost plans including without limitation any aspects relating to all of the Background Information and have carried out all necessary checks, investigations and enquiries of its own, executing and completing the works as per standards including commissioning to the satisfaction of Engineer-in-Charge.
K S M BASHIR MOHAMMAD AND SONS
VASCON ENGINEERS LTD
Tata Projects Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid