Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹1.7 Cr |
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
4 Apr 2026, 3:00 pmClosed
NAVEEN KUMAR
EXECUTIVE ENGINEER
FLOOD CONTROL DIVISION DALSINGHSARAI
GANESH PRASAD SINGH
SE
ANTI EROSION WORK BETWEEN KM 41.981 TO KM 42.081 OF CHANDPUR DHAMAUN RASALPUR DOWEL ON THE LEFT BANK OF RIVER GANGA. (AGENDA N0- 244/09/2026)
128440
05/SBD/2025-26(GR-06)
Open Tender
CIVIL
Samastipur
• REGISTRATION CERTIFICATE
• EMD
• AFFIDAVITS
• BID CAPICITY
• BID VALIDITY PERIOD
• Total value of civil engineering construction work performed in last five years.
• Work Experience of Similar nature
• Minimum Quantities of work done as prime contractor in any one year during last five years.
• Availability of key items of Contractor's Equipment
• Key Personnel
• Evidence of accesses to Financial Resources
• Proposed methodology and programe of construction.
• Litigation History
• Time of Completion
• I.T. & GST Registration & clearance Certificate
• NOC for Debar (If required)
• Character certificate
• Legal Status of Bidder.
• Any other documents as per NIT and Tender documents
• UNDERTAKING
CIVIL
PERCENTAGE
L1
1
20 documents required · 20 mandatory
₹10,000
Processing Fee: 3540
₹5.9 L
O/O CHIEF ENGINEER FLOOD CONTROL AND DRAINAGE WRD SAMASTIPUR
28 Apr 2026
30 Mar 2026
4 Apr 2026
30 Mar 2026
4 Apr 2026
30 Mar 2026
1 Apr 2026
Technical Sheet
Name of Work ANTI EROSION WORK BETWEEN KM 41.981 TO KM 42.081 OF CHANDPUR DHAMAUN RASALPUR DOWEL ON THE LEFT BANK OF RIVER GANGA. (AGENDA N0- 244/09/2026) Cost of Work as per BOQ(Rs in Lakhs) 294.75 Time of Completion in months 15.05.2026 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sactioned Amount Date of Sanction Date of Tender 04.04.2026
Sl No. Items Requirement Requirement Cl. No. Name of the contractor
Address of the contractor
1 Bid Validity Bids shall remain valid for a period not less than the period mentioned in NIT. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 120 Days Bid validity periods In days
2 Bid Security (A) Unconditional bank guarantee from any scheduled Nationalized Indian bank Amount To be entered (Rs in Lakhs)
(B) Earnest Money can be paid through Internet Payment Gateway (Credit/Debit Card), Net Banking, NEFT/RTGS in online mode. Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs) 589500 Bid Security Amount - (Rs in Lakhs).
3 (i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached (If any) or Not
4 Total value of civil engineering construction work performed in last five years. 1. Annual Financial Turn Over usually not less than 50% of the estimated annual payments under the contract (Rs in Lakhs)
2020 - 2021 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2021 - 2022 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2022 - 2023 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2023 - 2024 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2024 - 2025 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47
5 Work Experience of Similar nature Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs) Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done as prime contractor in any one year during last five years. Items Unit Quantity
Protection Work(Pitching/Crating/ Soling with Boulder/ Brick/Geo Bag/ E.C Bag/Nylon Crates/Gabians etc)– cum 4213
Value to be entered in unit Cum.
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period
(a) Existing commitments and ongoing works Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age in years Nos./ Max. Age
Pocklain/Excavator/Front end loader or any other loading machine Tipper /Tractor/Dumper 4
Tractor/Tipper/ Dumper 16/4/4 5/6/6
9 Key Personnel Personnel/Qualification/Contract Package Size Name of the Personnel and Experince in years
Site Engineer/ B.E. Civil+ 07 years exp. (3 years in Irrigation work) or retired A.E. 1
Site Supervisor / Fresh Graduate in Civil or Diploma Civil + 03 years Exp. Or retired ITI Holder 1
10 Evidence of accesses to Financial Resources Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
13 Affidavit Regarding statements made in the required attachments are true and correct.
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.
15 Time of Completion 15.05.2026 To be entered in months
16 Registration No.
17 I.T. & GST Registration & clearance Certificate
18 NOC for Debar (If required)
19 Character certificate
20 Any Other Document (As per NITand Tender Documents)
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Upto last day of the month Immediately preceding the last date of bids received. (PWD letter no. 2863(E) dt. 7.6.2017
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed (cum) @ Remarks
sheet pile E/W pcc/rcc/psc masonary work Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Link Name As Given in Adjacent coloumn in Edit Attachment Folder) Link Name in Edit Attachment Document attached
1 BIDSECURITY PHOTO COPY BID SECURITY PC
2 LAST 5 YEARS ANNUAL TURN OVER ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS EXP SIM NAT
4 QUANTITY OF WORK (E/W, PCC/RCC/ PSC etc, MASONARY WORK, SHEET PILE) EXECUTED DURING LAST 5 YEARS) WORK EXE QTY
5 BALANCE VALUE OF ON GOING WORKS BAL VAL WORKS
6 EXISTING COMMITMENTS EXIST COMT
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES BANK CER
8 AFFIDAVIT AFFIDAVIT
9 UNDERTAKING UNDERTAKING
10 LITIGATION HISTORY LIT HIS
11 PLANT and MACHINARIES PT & MAC
12 KEY PERSONNEL KEY PER
13 Registration REGISTRATION
14 Power of Attoney POW AT
15 Legal Status Of Bidder LEGAL
16 PROGRAMME Of CONSTRUCTION PROG CONS
17 IT & GST REGISTRATION and CLEARANCE CERTIFICATE IT ST CLEARANCE
18 CHARACTER CERTIFICATE CHARACTER
19 NOC FOR DEBAR DEBAR
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
BILL OF QUANTITY FOR ANTI EROSION WORK BETWEEN KM 41.981 TO KM 42.081 OF CHANDPUR DHAMAUN RASALPUR DOWEL ON THE LEFT BANK OF RIVER GANGA. (AGENDA N0- 244/09/2026)
Date of Tender :- 04.04.2026
Estimated Cost:- 29474942.00
Earnest Money :- 589500.00
Time of Completion :- 15.05.2026
Cost of BOQ :- 10000.00
Bid Processing fee :- 3540.00
Sl. No. ITEMS OF WORK QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 Providing filling Geo bags of size 1m x 0.70m weight of bag 420 gram. Volume of filling Geo bag 0.07m3, weight of filled bag 126 kg. with local sand stitching on four lines by approved nylon thread with stitching machine & generator, stacking and placing in Gabion of size 1.8m x 1.8m x 0.50m after loading, unloading and carriage with help of trolley within 150m lead including cost of Gabion etc. all complete as per specifications and direction of E/I ( where boat is used) SOR 5.7.48 1456 Each 7101.20 10339347.20
2 Supply of New bag and N.C. with Labour for filling new E.C. bags with local sand ( volume of filled bag 1.2 cft and weight 50 kg.) stitching on two lines by approved nylon thread with stiching machine & generator’. Stacking the bags and placing in Nylon crating of size (1M X 1M X 1M) with a lead 150 m including supply of nylon threads etc. placing the filled crates in dry portion within a lead of 30 m with Carriage of Filled E.C Bags by boat including loading, unloading and stacking with lead of 1/2 K.M. all complete including Royality as per approved design, specifications and direction of E/I S.O.R. 5.7.52 ( where boat is used) 7465 Each 1830.20 13662443.00
3 Supply of New bag with Labour for filling new E.C. bags with local sand ( volume of filled bag 1.2 cft and weight 50 kg.) stitching on two lines by approved nylon thread with stiching machine & generator’. Stacking the bags and placing with a lead 150 m including supply of nylon threads etc. with Carriage of Filled E.C Bags by boat including loading, unloading and stacking with lead of 1/2 K.M. all complete including Royality as per approved design, specifications and direction of E/I S.O.R. 5.7.53 ( where boat is used) 9441 Each 70.60 666534.60
Add 1 % Cess 246,683.25
Add S.FEE 63,756.03
Grand Total 29,474,941.61
1 Estimated cost :- 29474942.00
Executive Engineer, Flood Control Division, Dalsinghsarai
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBD 244 09 2026.doc
NIT • 1.60 MB
Circular 02.pdf
NIT • 1.71 MB
letter_0050_m.pdf
NIT • 0.50 MB
Circulars and Letters 1.doc
NIT • 10.23 MB
letter_0536_1.pdf
NIT • 0.06 MB
letter_0730_pmc1.pdf
NIT • 0.19 MB
letter_0739_pmc1.pdf
NIT • 0.14 MB
letter_1015_m Urgent.pdf
NIT • 0.82 MB
letter_2175.pdf
NIT • 0.09 MB
Ltr 915 dtd. 24.12.2022.pdf
NIT • 0.42 MB
NIT letter 717 pro (1).pdf
NIT • 6.14 MB
SBD 244 09 2026.doc
NIT • 1.60 MB
TECHNICAL SHEET 244 09 2026.xls
NIT • 0.14 MB
BOQ 244 09 2026.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .