| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC VILL CHATTER P O BHADERWAR TEH SARKAGHAT DISTT MANDI H P | ₹12.8 L Quoted ₹13.2 L | L1 | Accepted-AOC Found L1 |
| 2 | L2₹13.4 LRejected-Finance R O DEGREE COLLAGE 001 NEAR HAMIRPUR ANU HAMIRPUR H P | ₹13.4 L | L2 | Rejected-Finance Found L2 |
| 3 | L3₹13.9 LRejected-Finance MAIN BAZAR MEHRE BARSAR GROUND FLOOR TEHSIL BARSAR DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹13.9 L | L3 | Rejected-Finance Found L3 |
| 4 | Rejected-Technical MANDI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | - | - | Rejected-Technical Found Techno-Commercially Non-Responsive |
Tender Value
₹12.7 L
EMD Value
₹12,700
Closing Date
27 Feb 2026, 11:00 amClosed
Senior Executive Engineer
Senior Executive Engineer, O/o Electrical Division HPSEBL Barsar
Tender for Const. 100KVA, 11/0.4KV S/Stn a/w 11 KVHT and 3-Ph LT line by prov. SOP to LIS Samkari on Partial turnkey basis under ESD HPSEBL Bhareri. (ED Barsar).
2026_HPSEB_129032_1
HPSEBL/EDBSR/E(DS)/2025-26/35
Open Tender
Electrical Works
60 days
SAMKARI BHARERI
Please refer tender documents
4 documents required · 4 mandatory
₹590
₹12,700
17 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
100, KVA,11/0.4KV Distribution Transformer conforming to ISI & BEE Specifications.
9Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713 / 1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-32.
RCC Muff 2000mm Long with concrete filling
MS Channel Iron X-Arm, [Size (100x50x5)mm, Length : 2800 mm x 2 Nos] for Incomer Line.
MS Angle Iron (50X50x6 mm), Length: 2800 mm x (1 Nos for LA's ).
MS Channel Iron X-Arm:[Size (75x40x4.8)mm, Length : 2800 mm x 4 Nos] supporting DO fuse unit & GO switch.
MS Channel Iron X-Arm, [Size (100x50x5)mm, Length : 2800 mm x 2 Nos] for Transformer Bed.
MS Channel Iron X-Arm:[Size (100x50x6 mm), Length : 460 mm x 2 Nos] for supporting Main Channel of Transformer].
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos. for Belting of Transformer
MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos for supporting Belt X Arms.
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracings.
MS Angle Iron (50X50x6 mm), Length: 2800 mm x ( 2 No. for LT Distribution Panel Box).
MS Angle Iron (50X50x6 mm), Length: 450 mm x 1 Nos.
GO Switch Handle Supporting (Channel Iron (75x40x4.8mm) Length:460mm
GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)
Stay Set Complete i/c Guy Assembly and Helically fittings)
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Sub-Station Pipe Earthing Set
6 SWG GI wire for Earthing
LT Distribution Panel Box suitable for 100KVA, 11/0.4KV (Outdoor type) Sub-Station transformer comprising of 01No. 3Pole MCCB, 160 Amps, 35KA,4P ICS = 100% ICU, KIT.KAT 200Amps Capacity equipped with Phase indicator lamps, 3phase Volt & current measuring equipment, Panel Box is duly painted powder coated paint complete in all respect as per HPSEBL/REC specifications comprises of following items (ACB & MCCB of make Schneider/L&T/ABB).
Half Clamp made of MS Flat 50x6mm
Full Clamp made of MS Flat 50x6mm
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
Aluminium Thimble
Copper Thimble 300mm2
Danger Plate
Barbed Wire
LT Cable(XLPE Cable) (3.5 Core) 185mm²
Energy Meter (3-Phase, 4-Wire) DLMS compliant 200/5Amps , Accuracy Class 0.5s, LT CT Type for 100 KVA
Aluminium Paint.
Red Oxide
LT Switch Capacitors 36-kvar for 100 KVA
Providing and fixing of GI Chain link febric fencing 6.6 Mtr x 3.8 Mtr x 2Mtr of required width in mesh size 50x50mm fencing with Gate of of size 1x2Mtr made of MS Steel angle Iron including providing of material i.e. i) 0.40Cum Concrete 1:4:8, ii) 68Kg Structural steel work in single section iii) 83.73Kg Steel work welded in built up section iv) 41.60 m² - GI Wire mesh 50x50mm ,4mm dia wire including Painting with synthetic enamel paint of approved brand & erection etc complete in all respect.
HT LINE : ACSR 6/1/3.35(50mm²) conductor {Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage}
10 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-32.
RCC Muff 2000mm Long with concrete filling material
Ms Channel Iron (Horizontal)- MS Channel Iron: 100x50x5, Length 1270mm .
MSAI for single pole str of Size 750x50X50x6mm each ( 2 Nos per str. )
Pole Top Bracket - made of MS Channel Iron : 100x50x6, - 100mm
11 kV Pin Insulators (Porcelain 12 kV, 10 KN) with GI Pin (3Nos. Per Pole Structure)
Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)
MSAI.Belt Set Size (1800x50x50x6 mm) for Double Pole str. (2Nos per Set)
MSAI X-Bracing Set for double pole str of Size 2125x50X50x6mm each ( 2 Nos per set ).
X-Arm (Horizontal)-MS Channel Iron C type of Size 100X50x5mm Length:2340mm x 2nos.
HT Stay Set Complete i/c Guy Assembly and Helically fittings)
Stay wire 7/3.15 mm@ 9.00 kG per stay set
HT Pipe Earthing Set complete in all respect.
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)} including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] at road crossings {0.102 kg/m}
Eye Hook for Earth wire
MSAI.of Size (50x50x6 mm) :2800mm for Road crossing
Half Clamp made of M.S. Flat of size(50 x 6mm).
Full Clamp made of M.S. Flat of size(50 x 6mm).
Danger Plate (250X200X1.6 mm)
M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)]
Barbed Wire
Red Oxide
Aluminium Paint
Prov. 11KV CT-PT (1 Unit,11 KV/110 V; CT 3no 10/5A)
GO Switch Handle Supporting (Channel Iron (75x40x4.8mm) Length:460mm
GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type
D.O Fuse Unit
Automation and digitisation equipments for 11KV System i.e. One Nos. HP All-in-One 24-cb1907in All-in-One Personal Computer having 12th Generation Intel® Core™ i5 processor Windows 11 Home 60.5 cm (23.8) diagonal FHD display 8 GB DDR4-3200 MHz RAM (2 x 4 GB) Intel® Iris® Xᵉ graphics 512 GB Intel® PCIe® NVMe™ SSD with One printer i.e.HP LaserJet Pro MFP M126a & power UPS.
3-ph LT LINE : AAAC 7/3.15mm (55mm²) conductor {Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage} .
8Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-32.
RCC Muff 2000mm Long with concrete filling material
Channel Iron (75x40x4.8) [Length- 1.50 Mtr + 0.2 Mtr]
Shackle Insulator (16 kN)
D-Iron (U- Clamps)made of MS Flat 50x6mm.
Earh Knob
LT Stay Set Complete i/c Guy Assembly and Helically fittings)
Stay wire 7/3.15 mm (6.00 kg. per stay set)
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m}
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
Half Clamp made of MS Flat 50x6mm
Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
Red Oxide
Aluminium Paint
Erection of 11/0.4KV, 100KVA Sub-Station Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing of GO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc., Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets (2 Nos.), Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect.
ERECTION OF 11KV HT LINE : Erection of Single Pole Run through Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection complete in all respect.
Laying of Conductor, Stringing, Sagging of ACSR 6/35/3.35 (50mm²) and binding with Insulators (3 wires) and fixing of jumper.
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators.
Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set).
Erection of 11KV CT-PT (1 Unit,11 KV/110 V; CT 3no 10/5A),One Set of GO AB Switch Assembly and allied material including MS Channel X-Arms,GO Switch Assembly & making its connections etc. complete in all respect as per latest standard practices /specification of REC / HPSEBL.
ERECTION OF LT LINE :Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Laying of Conductor, Stringing, Sagging of AAAC, 55mm² ,7/3.15mm² and binding with Insulators (3 wires) and fixing of jumper.
Erection Charges of fixing of Jumpers of LT line as per latest standard practices /specification of REC / HPSEBL (Per Set).
Local Transportation Charges for the carriage material by road & through manual carriage to the site of work for 1Nos 100KVA,11/0.4KV Sub-Stations and their associated HT/LT Lines. (Complete Job)
Testing fees & Commissioning Charges etc. for 1No. 100KVA,11/0.4KV Sub-Stations a/w associated HT/LT Lines & HT Metering Equipment. (Complete Job).(as per Schedule of General & Service Charges & HP Govt. Notification)
Labour Cess (@ 1% of the total amount of the supply, erection, testing & commissioning of 1Nos., 100KVA,11/0.4KV Sub-Stations and their associated HT/LT Lines. etc. (for complete Job).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
TenderdocumentNIT35.rar
Tender Documents • 3.98 MB
BOQ_190758.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid