Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.6 LAdmitted-Finance | +5.00% | ₹22.6 L | L1 | Admitted-Finance |
Tender Value
₹21.6 L
EMD Value
₹43,140
Closing Date
10 Jul 2026, 5:00 pmClosed
EO
NP PAOTA-PRAGPURA
WORK NO 12
2026_DLB_572267_12
E NIT 25/2026-27 REF NO 182 DATE 30-06-2026
Open Tender
Civil Works
Percentage
NP PAOTA-PRAGPURA
WORK NO 12
2 documents required · 2 mandatory
₹1,000
NP PAOTA-PRAGPURA
₹43,140
Yes
21 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m | 126 | P/Cum | 178.5 | ₹22,491 |
| 2 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 15.75 | P/Cum | 2,955 | ₹46,541.25 |
| 3 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:4 (1 cement : 4 coarse sand) | 94.5 | P/Cum | 5,130 | ₹4,84,785 |
| 4 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:4 (1 cement : 4 coarse sand)Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | 37.8 | P/Cum | 5,830 | ₹2,20,374 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 14.49 | P/Cum | 5,510 | ₹79,839.9 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 70 | sqm | 236.5 | ₹16,555 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 336 | sqm | 367 | ₹1,23,312 |
| 8 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all completeThermo-Mechanically Treated bars | 1,500 | kg | 83.3 | ₹1,24,950 |
| 9 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 38.64 | P/Cum | 5,400 | ₹2,08,656 |
| 10 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (Coloum) | 21.6 | P/Cum | 5,400 | ₹1,16,640 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_1018238.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .