| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.9 LRejected-AOC | ₹2.9 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K.Saravanakumar L2 | J Ashok L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all classes of soil with an initial lead and lift of 10 m & 2 m including Cost of labour and conveyance as per Standard Specification SS 20 B | 20.96 | cum | 203 ₹4,254.88 | 197 ₹4,129.12 |
| 1.02 | Cement Concrete 1:4:8 Mix by using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete comply | 2.05 | cum | 5,383 ₹11,035.15 | 5,377 ₹11,022.85 |
| 1.03 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild stee | 47.54 | Sqm | 553 ₹26,289.62 | 547 ₹26,004.38 |
| 1.04 | Supplying, fabricating and placing in position mild steel / ribbed tor steel grills for all RCC works as per design given including cost of steeel and G.I binding wire in all gloors etc. complete complying with standard specification. | 433.31 | cum | 92 ₹39,864.52 | 91.9 ₹39,821.19 |
| 1.05 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 6.86 | Sqm | 9,115 ₹62,528.90 | 9,109 ₹62,487.74 |
| 1.06 | Plastering with cement mortar 1:5 mix to 12mm thick in all floors including cost and conveyance of all materials to site and all labour charges etc | 84.11 | cum | 288 ₹24,223.68 | 282 ₹23,719.02 |
| 1.07 | Brick work using country bricks of size 83/4" x41/4"x23/4" in cement mortar 1:5 (one cement and five M.Sand ) including curing neat finishing etc., complete complying with standard specification | 8.6 | cum | 6,091 ₹52,382.60 | 6,085 ₹52,331 |
| 1.08 | Refilling in foundation and basement with excavated earth in layer of nor more than 15cm thick | 12.94 | cum | 51 ₹659.94 | 45 ₹582.30 |
| 1.09 | Painting in two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class fquality and of approved colour over a priming coat including thorough scrapping clean removal of dirt, and including necessary paster of paris putty, | 84.11 | cum | 267 ₹22,457.37 | 262 ₹22,036.82 |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST | 43,865.4 ₹43,865.40 | 43,584.2 ₹43,584.20 |
Tender Value
₹2.9 L
EMD Value
₹2,900
Closing Date
2 Jan 2026, 3:00 pmClosed
Block Development Office BP
Panchayat Union Office, Andipatti
Construction of compound wall in PUE school in Anuppapatti village at Anuppapatti Panchayat under PUGF 2025-2026
2025_RDTN_637349_4
USS PUGF 2025-2026 02.01.2026
Open Tender
Civil Works - Others
120 days
Andipatty
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,900
Yes
19 Jan 2026
30 Dec 2025
2 Jan 2026
30 Dec 2025
2 Jan 2026
30 Dec 2025
Amount
Earth work excavation in all classes of soil with an initial lead and lift of 10 m & 2 m including Cost of labour and conveyance as per Standard Specification SS 20 B
Cement Concrete 1:4:8 Mix by using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete comply
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild stee
Supplying, fabricating and placing in position mild steel / ribbed tor steel grills for all RCC works as per design given including cost of steeel and G.I binding wire in all gloors etc. complete complying with standard specification.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12mm thick in all floors including cost and conveyance of all materials to site and all labour charges etc
Brick work using country bricks of size 83/4" x41/4"x23/4" in cement mortar 1:5 (one cement and five M.Sand ) including curing neat finishing etc., complete complying with standard specification
Refilling in foundation and basement with excavated earth in layer of nor more than 15cm thick
Painting in two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class fquality and of approved colour over a priming coat including thorough scrapping clean removal of dirt, and including necessary paster of paris putty,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.Saravanakumar (BID ID -1551998)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_762799.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid