Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹41.9 LAccepted-AOC | ₹41.9 L | 1 | Accepted-AOC Lowest bidder. Justification provided. |
| 2 | 2₹41.9 LSame as 1Rejected-Finance | ₹41.9 LSame as 1 | 2 | Rejected-Finance Justification not provided. |
| 3 | 3₹43 L+₹1.1 L (2.58%)Rejected-Finance | ₹43 L+₹1.1 L (2.58%) | 3 | Rejected-Finance Higher bid value |
| 4 | 4₹43.9 L+₹1.9 L (4.65%)Rejected-Finance | ₹43.9 L+₹1.9 L (4.65%) | 4 | Rejected-Finance Higher bid value |
| Sl No | Description | Qty | Unit | GANESH KALITA L1 | SRI HEMANTA DAS L1 | MAA ENTERPRISE L2 | KAMAKHYA ALUMINUM EMPORIUM L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in-charge. All kinds of soil | 205.82 | cum | 176.69 ₹36,366.34 Lowest | 176.69 ₹36,366.34 Lowest | 182 ₹37,459.24 | 184.91 ₹38,058.18 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 173.29 | cum | 218.4 ₹37,846.54 Lowest | 218.4 ₹37,846.54 Lowest | 224 ₹38,816.96 | 228.56 ₹39,607.16 |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 71.47 | cum | 1,858.63 ₹1,32,836.29 Lowest | 1,858.63 ₹1,32,836.29 Lowest | 1,910 ₹1,36,507.7 | 1,945.08 ₹1,39,014.87 |
| 4.00 | Along the external wall below concrete or masonry apron us ing chemical emulsion @ 2.25 litres per linear metre includ ing drilling and plugging. With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration | 249.5 | metre | 38.44 ₹9,590.78 Lowest | 38.44 ₹9,590.78 Lowest | 40 ₹9,980 | 40.23 ₹10,037.39 |
| 5.00 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 301.14 | sqm | 220.29 ₹66,338.13 Lowest | 220.29 ₹66,338.13 Lowest | 226 ₹68,057.64 | 230.54 ₹69,424.82 |
| 6.00 | Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre and sealing the same. | 107.6 | metre | 221.49 ₹23,832.32 Lowest | 221.49 ₹23,832.32 Lowest | 228 ₹24,532.8 | 231.8 ₹24,941.68 |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) | 26.87 | cum | 5,736.42 ₹1,54,137.61 Lowest | 5,736.42 ₹1,54,137.61 Lowest | 5,896 ₹1,58,425.52 | 6,003.23 ₹1,61,306.79 |
| 8.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).complete as directed. | 2.32 | sqm | 388.94 ₹902.34 | 388.94 ₹902.34 | 340 ₹788.8 Lowest | 407.03 ₹944.31 |
| 9.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 43.54 | cum | 7,193.21 ₹3,13,192.36 Lowest | 7,193.21 ₹3,13,192.36 Lowest | 7,394 ₹3,21,934.76 | 7,527.78 ₹3,27,759.54 |
| 10.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 28.9 | cum | 9,218.6 ₹2,66,417.54 Lowest | 9,218.6 ₹2,66,417.54 Lowest | 9,476 ₹2,73,856.4 | 9,647.37 ₹2,78,808.99 |
Tender Value
₹48.7 L
EMD Value
₹97,490
Closing Date
2 Aug 2025, 2:00 pmClosed
Executive Engineer,PWD
O/o the Executive Engineer,PWD,Bajali District Territorial Building Division,Pathsala
Construction of RCC School Building for Special Children under the Students Welfare Mission for MPLADS Fund (Rajya Sabha) for the year 2025-26
2025_PWBNH_45729_1
EE/BAJ/BLDG/TB-21/2024-25/463
Open Tender
Civil Works - Building
Item Rate
Pathsala
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹97,490
Yes
Pathsala
22 Aug 2025
18 Jul 2025
2 Aug 2025
18 Jul 2025
2 Aug 2025
18 Jul 2025
18 Jul 2025 - 2 Aug 2025
31 Jul 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .