Loading…
Loading…
Tender Value
₹68.1 L
EMD Value
₹1.4 L
Closing Date
2 Aug 2024, 10:30 pmClosed
Minor Irrigation Department
T N RAMACHANDRA
08172234026
Package-15-Providing electrification to the borewells drilled in the lands of 1) Akkayamma w/o Dyavaiah of Shankaripuram (Chowdahalli Kattaya Hobli) Village 2) Chandraiah s/o Javaraiah of Sankalapura Village 3) Rangamma w/o Late.Ningaiah of Sankenahalli Village 4) Rangaswamy (Rangaiah) s/o Ramaiah of Bidarikere Village 5) Dyavaiah s/o Dyavaiah of Mugaluru (Kindipura) Village 6) Rangaswamy s/o Kariyaiah of Yadiyuru (Bhallenahalli) Village 7) Timmaiah s/o Late Timmaiah of Anachihalli Village 8) Eraiah s/o Dhootaiah of Agalahalli Village 9) Lakshmamma w/o Kalaiah (Kalasaiah) of Agile (Doddabaganahalli) Village 10) Jayamma w/o Puttaswamy of Hanumanthapura Village 11) Puttamma w/o Late.Tirumalaiah of Haluvagilu (Anniganahalli) Village 12) Arasaiah s/o Late.Dyavaiah of Haluvagilu Village 13) Dyavaiah s/o Late.Timmaiah of Haluvagilu Village 14) K.T.Mallesha s/o Timmaiah of Huvinahalli Kavalu Village 15) Gowramma w/o Rangaiah of Huvinahalli (Muguluru) Village 16) Ramesh s/o Rangaiah of Kindipura (Muguluru) Village 17) Rajanna s/o Dasaiah of Tejuru Village 18) Puttaiah s/o Tammappa of Tejuru Village 19) Kariyaiah s/o Late.Kariyaiah of Tejuru Village 20) Yallamma w/o Mallesha if Doddabaganahalli Village 21) Eraiah s/o Late.Mariyaiah of Timmanahalli Village , Kasaba Hobli, Hassan Taluk , Hassan Dist.
MI/2024-25/EL/WORK_INDENT2269
MI/2024-25/EL/WORK_INDENT2269
Open
Electrical
Two Tender Document System(Two Cover)
Minor Irrigation Division Hassan
8 documents required · 8 mandatory
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
ITT (3.2(b) To qualify for award of this contract , Mandating satisfactory completion as a prime contractor, at least one similar nature of work as providing Electrification of 11kv line using Rabbit ACSR conductor AND Errection of 25 kVA, 11kv Transformer (in the last five years periodi.e.,2019-20, 2020-21, 2021-22, 2022-23 and 2023-24) to an extent of 50% of the cost of the work for all works costing up to Rs.34.07 Lakhs.
ITT 3.2(c) To qualify for award of this contract each tenderer in its name should Execute in any one year (for a continuous period of 12 months) the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00 lakhs. 1) 11kv line using Rabbit ACSR Conductor: 34.00 km 2) Errection of 25 kVA, 11kv Transformer : 23 Nos 3) Erection of 9/8 Mts Long RCC/PSCC Poles : 223 Nos 4) Providing Guy Sets: 149 set
IIT 3.2(a) To qualify for award of this contract each tenderer in his name should have in the last five years period (i.e., 2019-20,2020-21, 2021-22, 2022-23 and 2023-24) achieved in at least two financial years an average annual financial turnover of Rs.69.00 Lakhs(in all classes of civil engineering construction works only)
IIT 3.3(b)liquid assets and /or availability of credit facilities of not less than Rs.20.50 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually 30% of the amount of contract) for works costing up to Rs.100.00 lakhs
Contractor Registration Certificate
Contractor shall have one Graduate Engineer with 5 years Experience for work Supervision
List of existing commitments and ongoing works
Valid GST, ESI & EPF certificate
Works for which Tenders already submitted
₹1,710
₹1.4 L
24 Jul 2024
24 Jul 2024
3 Aug 2024
1 Aug 2024
Package-15-Providing electrification to the borewells driled in the lands of 21 beneficiaries in Kasaba Hobli, Hassan Taluk , Hassan Dist.
RCC Pole 9 mtr long 145 KG WL-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
RCC Pole 9 mtr long 145 KG WL-Labour Charge ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-9 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
PSCC Pole 9 mtr long 200 Kg WL-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
PSCC Pole 9 mtr long 200 Kg WL -Labour Charge ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-9 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
Spiral earth electrode-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Providing Spiral Earth Electrode type earthing (without charcoal, salt etc.,)-Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS-For RCC Pole -Material cost ---- etc., complete with all leads and lifts as per standard specifications and ...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS-For RCC Pole-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and ...
11 kV, 45 kN Polymeric Insulator-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of...
Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-
Material cost ---- etc., complete with all leads and lifts as per standard specifications and di...
Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and di...
ACSR Conductor as per IS-398 (Part - 2/1996) -Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM -Material cost ---- etc., complete with all leads and lifts as per standard specifications and...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.-Labour Charges (Per Km Per Wire) ---- etc., complete wi...
PG Clamp - Rabbit to Rabbit-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Erection of 3 Phase, 11kV/433V,25 kVA BEE-4/5 Star Rated Distribution Transformer Centre using 9 mtr RCC Pole DPTC-i) Using 4 star Rated Transformer-Material Charges ---- etc., complete with all leads...
Erection of 3 Phase, 11kV/433V,25 kVA BEE-4/5 Star Rated Distribution Transformer Centre using 9 mtr RCC Pole DPTC-i) Using 4 star Rated Transformer-Labour charges ---- etc., complete with all leads a...
Loading & Unloading of Transformer - 25 kVA- Loading ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading & Unloading of Transformer - 25 kVA- Un loading ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Transporation by Head Load where ever there is no accessability for transporation by vechicle -Distribution Transformer 25 kVA-25 to 105 Mtr (Per Transformer) ---- etc., complete with all leads and li...
Transparent Alkathine tube 19 mm dia, 2 mm thick in coils of 30 Mtr -Material cost) ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge...
RCC Pole - 8 M Long, 115 Kg WL -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
RCC Pole 8 mtr long,115 kg WL -Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-8 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
PSCC Pole - 8 M Long 200 Kg WL -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
PSCC Pole 8 mtr long 200 KG WL -Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-8 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS-For RCC Pole- Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Eng...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS-For RCC Pole- Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engine...
1.1 kV Ceramic Pin Insulator With GI pin -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
No. 8 Strain insulator-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Guy set with No. 8 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-
Material cost ---- etc., complete with all leads and lifts as per standard specifications and dir...
Guy set with No. 8 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and dir...
ACSR Conductor as per IS-398 (Part - 2/1996)-Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM -Material cost ---- etc., complete with all leads and lifts as per standard specifications and ...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.-Labour Charges (Per Km Per Wire) ---- etc., complete wi...
Supervision Charges over the Estimated Cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Estimate Supervision Charges ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Transformer Inspection Charges ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
D11- LT AC 3 Phase 4 Wire, 5-30 Amps DLMS Complaint Energy Meter, 1.0 Accuracy Class (Used for LT-2, LT-3 & LT-5 Installations up to 25HP/18KW) ---- etc., complete with all leads and lifts as per stan...
Security Deposit-LT-4(a)-Applicable to IP-Sets upto and inclusive of 10HP-Rs.1480.00/HP (Per HP) ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engin...
Electrical Inspectrate Charges Scale of Inspection Fees of Electrical Inspector Rate Schedules: Fees for Initial inspections. ---- etc., complete with all leads and lifts as per standard specification...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
royalty (1).pdf
Others - Royalty • 12.37 MB
government notification bc loc letter to be issued by the bank (1).pdf
Others - government notification • 1.72 MB
bar chart-ELE-2269.xls
Others - BAR CHART • 0.28 MB
e_payment.doc
Instructions to Tenderers • 0.19 MB
kw-3_bid document KPPP FORMAT-2269.doc
Tender Document • 2.00 MB
labour.docx
Others - labour • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].